Indonesian Political, Business & Finance News

Zulhas Reveals 8 New Waste-to-Energy Plants to Be Built After Bali Project

| Source: detikBali Translated from Indonesian | Infrastructure
Zulhas Reveals 8 New Waste-to-Energy Plants to Be Built After Bali Project
Image: detikBali

The government is set to accelerate the construction of Waste-to-Energy (PSEL) plants. Coordinating Minister for Food Zulkifli Hasan stated that after the first project in Bali, eight more PSEL facilities will soon be built in various regions.

“After this, there will be 8 more PSEL plants to be built. Bali is the first, then there will be 8 more,” Zulhas said during a press conference following the launch of the PSEL construction in Pesanggaran, Denpasar, on Wednesday (8/7/2026).

According to Zulhas, the government is targeting the construction of 24 PSEL plants across Indonesia within the next two years as part of efforts to tackle the waste problem.

“But this will only solve 22 per cent, there is still 77 per cent remaining. That will be addressed with various technologies,” the National Mandate Party (PAN) chairman added.

Zulhas stated that the PSEL development is a National Strategic Project (PSN) under President Prabowo Subianto’s programme. He expressed hope that the PSEL in Bali would be completed by the end of 2027 and inaugurated directly by Prabowo.

He assessed that Indonesia’s waste problem has reached emergency levels. He cited the fires at the Bantargebang and Jatiwaringin landfills as reflections of this condition.

Zulhas said Prabowo is paying special attention to the waste issue. The matter was also discussed in a cabinet meeting, including the handling of waste in Bali.

“I said that in two years the waste problem can be resolved, the emergency ones, not all of them. The emergency ones are those open dumping sites, the ones that are piled up,” he explained.

The central government, through Danantara Indonesia, officially commenced the construction of the Waste-to-Energy (PSEL) plant in Pesanggaran, Denpasar, Bali, on Wednesday (8/7/2026). This PSEL is the first of its kind to be built in Indonesia.

The groundbreaking was carried out by Coordinating Minister for Food Zulkifli Hasan, accompanied by Minister of Environment Jumhur Hidayat, Minister of Investment and Downstreaming/BKPM Rosan Roeslani, Danantara CIO Pandu Patria Sjahrir, and Bali Governor Wayan Koster.

More from 8 July 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/zulhas-reveals-8-new-waste-to-energy-plants-to-be-built-after-bali-project-1783500659)
Originally published by detikBali (https://www.detik.com/bali/bisnis/d-8565238/zulhas-ungkap-8-psel-baru-segera-dibangun-usai-proyek-bali), translated from Indonesian
Print