Indonesian Political, Business & Finance News

West Java Secretary Explains Reason for Demolishing Library at Gasibu Field

| | Source: Media Indonesia Translated from Indonesian | Politics
West Java Secretary Explains Reason for Demolishing Library at Gasibu Field
Image: Media Indonesia

The West Java Provincial Government has demolished a library within the Gasibu field area in Bandung. West Java Regional Secretary Herman Suryatman revealed that the demolition was carried out as part of an adaptation process in the reorganisation of Gasibu field and its integration with the grounds of Gedung Sate, which serves as the office of the West Java Provincial Government.

“The demolition of the library and the reorganisation of Gasibu field is an effort to promote harmony between natural and man-made elements. The aim is for Gasibu field to be tidier, more functional and more beautiful in future,” he explained on Sunday (12/7).

The Gasibu library was built during the tenure of West Java Governor Ahmad Heryawan and was inaugurated in 2016. Herman further confirmed that the administrative process for the demolition, or the write-off of government property, had been completed beforehand.

However, Herman assured that the West Java Provincial Government remains committed to providing literacy facilities in the form of a library. As a replacement, the library will be transformed into a digital library. “Meanwhile, for residents who need conventional literacy facilities, a mobile library is being prepared,” he stated.

He added that Gasibu field will be integrated with Gedung Sate, whilst the public will continue to receive literacy facilities. The project to reorganise and integrate the front grounds of Gedung Sate with Gasibu Field is the idea of Governor Dedi Mulyadi. An initial budget of around Rp15 billion to Rp15.82 billion from the 2026 regional budget was allocated to fund the project, but after the tender was held, the contract value came to Rp12 billion.

In this reorganisation, the West Java Provincial Government is uniting and integrating the plaza in front of Gedung Sate with the Gasibu Field area so that they become a single public space.

The reorganisation aims to address traffic congestion, improve accessibility in the area, and restore the dignity of the seat of government. As an effort to tackle congestion, the works are intended to prevent the total closure of Diponegoro Street in front of Gedung Sate during protests or major events.

Traffic flow arrangements involve redirecting vehicle lanes towards the front area, so that traffic in front of Gedung Sate remains smooth.

In terms of landscape integration, the project will level the surface heights of the Gasibu grounds and the Gedung Sate grounds so they appear unified and open. The broader aim of the project is to provide residents with a more spacious and well-organised space for activities without obstructing public access.

The expected outcome of the project is the unification of the front grounds of Gedung Sate with Gasibu Field. The project will close vehicle access on Diponegoro Street in front of Gedung Sate, turning it into a fully pedestrian and public space. In addition, the project will replace the road surface material from asphalt to andesite stone for the aesthetic quality of the area.

More from 12 July 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/west-java-secretary-explains-reason-for-demolishing-library-at-gasibu-field-1783853430)
Originally published by Media Indonesia (https://mediaindonesia.com/nusantara/910067/-sekda-jawa-barat-jelaskan-alasan-pembongkaran-perpustakaan-di-lapangan-gasibu), translated from Indonesian
Print