Waskita Karya to Build Yogyakarta-Bawen Toll Road Section 3 Worth IDR 2.1 Trillion
State-owned construction company PT Waskita Karya (Persero) Tbk has won a new contract worth IDR 2.1 trillion to build Section 3 of the Yogyakarta-Bawen Toll Road, which includes the Magelang-Borobudur interchange. Director of Operations I Ari Asmoko stated that the Magelang and Borobudur interchanges are strategic access points, serving as the main gateway to the Borobudur National Tourism Strategic Area (KSPN). “This project is crucial for accelerating mobility while boosting the tourism sector. With the Yogyakarta-Bawen Toll Road Section 3, the public will have direct access to the Borobudur Temple Super Priority Destination without disturbing the preservation of the cultural heritage site,” Ari said in an official statement in Jakarta on Tuesday.
Through a Joint Operation (KSO) with PT PP and Wijaya Karya, the company will construct an 8.1-kilometre stretch located in Magelang Regency, Central Java. The scope of work includes the main alignment, the Magelang access route, interchanges, pedestrian bridges, an underpass, and pile slab construction. Ari noted that the project would positively impact the local economy by attracting more tourists to the Borobudur area, thereby opening up opportunities for Micro, Small, and Medium Enterprises (MSMEs). He added that the environmentally friendly toll road would also support new investment and facilitate the distribution of goods and services in the Magelang, Temanggung, and surrounding regions.
“The Magelang-Borobudur interchange is also designed to reduce congestion on the main arterial roads. We hope this will ease the movement of logistics vehicles,” Ari explained. During construction, the company will implement several innovations to improve efficiency, including the Curing Automatic method to prevent concrete shrinkage cracks and a Deflection Warning System to monitor formwork and shoring during casting. To manage traffic safely through the active construction zone, Waskita Karya will optimise a Traffic Management Plan, provide detour routes, and deploy a Roboflagman for automated traffic control in all weather conditions.
“As a state-owned construction enterprise with over 65 years of experience in building infrastructure, Waskita Karya is committed to completing this National Strategic Project (PSN) on time and to the highest standards. The construction of Yogyakarta-Bawen Toll Road Section 3 reinforces our contribution to improving public welfare and advancing the nation,” Ari concluded. The entire Yogyakarta-Bawen Toll Road spans 75.12 km, connecting the Special Region of Yogyakarta with Semarang Regency in Central Java, and is expected to reduce land travel time between the two cities from three to four hours to just about one hour.
Source: jawawa.id (https://jawawa.id/newsitem/waskita-karya-to-build-yogyakarta-bawen-toll-road-section-3-worth-idr-2-1-trillion-1782204993)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5619384/waskita-karya-garap-tol-yogyakarta-bawen-seksi-3-senilai-rp21-triliun), translated from Indonesian