Vehicle Queues at Gilimanuk Port Stretch to 2.5 Kilometres Due to Port Works
Vehicle queues heading towards Gilimanuk Port, Jembrana Regency, Bali, stretched to 2.5 kilometres this afternoon. The congestion was caused by the implementation of the ‘Arrive, Unload, Depart’ (TBB) scheme as well as ongoing pier revitalisation works.
According to information obtained, the vehicle queue began extending onto the Denpasar-Gilimanund National Road since Friday afternoon. By this afternoon, the tail of the queue had reached the Gilimanuk petrol station, approximately 2.5 km from the port entrance.
“This afternoon, it reached near the Gilimanuk petrol station. The queue occurred due to high vehicle volume and the enforcement of the TBB scheme, as queues at Ketapang Port exceeded 10 km,” stated the Chief of Gilimanuk Port Area Police, AKP Gusti Kade Alit Murdiasa, when confirmed on Saturday.
Murdiasa explained that several personnel have been deployed to manage traffic flow and alleviate the vehicle buildup towards Gilimanuk Port. According to him, the queue began to dissipate towards the late afternoon.
“As of 3:00 PM WITA, the queue has started to clear. The queue is now approximately 700 metres from the port entrance,” he added.
Murdiasa urged ferry passengers to remain orderly and patient while the pier improvement project at Gilimanuk Port continues. He requested that motorists avoid overtaking one another to prevent the congestion from worsening.
“Hopefully, the works to upgrade the status of the piers at Gilimanuk and Ketapang Ports will be completed soon so that long queues do not recur,” concluded Murdiasa.
Source: jawawa.id (https://jawawa.id/newsitem/vehicle-queues-at-gilimanuk-port-stretch-to-2-5-kilometres-due-to-port-works-1789807883)
Originally published by detikBali (https://www.detik.com/bali/berita/d-8670006/antrean-kendaraan-ke-pelabuhan-gilimanuk-mengular-2-5-kilometer-gegara-ini), translated from Indonesian