Indonesian Political, Business & Finance News

U.S. firm mulls building geothermal power plant from Sidoarjo mudflow

| | Source: JAKCHAT
Normal temperature gradient is 0.1 degree C per every 100 feet metres. To get down to 180 C they would have to drill @ 4,000 feet. In that area, I think they would have a problem creating a stable well environment given the damge done to the formation already.
Tags: business
View JSON | Print