Trenggono Prepares Pengambengan PPN to Become a World-Class Port
Minister of Marine Affairs and Fisheries Sakti Wahyu Trenggono stated that the development of the Pengambengan Nusantara Fishing Port (PPN) in Jembrana, Bali, into a world-class port is expected to bring significant opportunities for the future of Bali.
Trenggono explained that this development will transform PPN Pengambengan into a world-class fishing port that integrates fishing activities, processing, and the distribution of fishery products to global markets.
“In addition to economic development, this construction is hoped to become a place that combines the modern fishing industry and tourism, thereby bringing good opportunities for the future of Bali,” Trenglar said in Jembrana, Bali, on Tuesday.
He noted that the planning and commencement of this ‘Integrated Fishing Ports and International Fish Market Phase I’ project required a considerable amount of time, as the ministry is not only preparing funding but also seeking support from business actors and the local fishing community.
Furthermore, the Ministry of Marine Affairs and Fisheries must ensure that the development accommodates the needs of both small and large-scale fishery businesses, as well as local traditional fishermen.
With this expansion, PPN Pengambengan, which has previously focused on port services, will become integrated with processing, marketing, and distribution industries.
The variety of landed fish will also increase, including tuna. The designed eco-friendly construction and operational concept of the port also has the potential to become a new tourism hub in the western region of Bali.
Another major change in the development of PPN Pengambengan includes the expansion of the fishing port area, which will grow from 13.5 hectares to 49.3 hectares.
Similarly, the area of the port basin will expand from 24 hectares to 88.3 hectares, with a vessel capacity increasing to 1,600 units from the previous 1,273 units.
With this expansion of the docking basin, PPN Pengambengan will be ready to accommodate large-tonnage fishing vessels from Benoa Port.
In terms of productivity, the volume of fish landings is expected to increase significantly from 61,300 tonnes per year to 124,000 tonnes per year, with the potential for Non-Tax State Revenue (PNBP) reaching IDR 104 billion per year, up from the current IDR 48 billion per year.
The number of absorbed workers is also expected to rise substantially to approximately 25,000 people, nearly a threefold increase from the current workforce.
The development of PPN Pengambengan is projected to be completed by the end of 2029, with a contract value of IDR 1.27 trillion, supported by the Islamic Development Bank (IsDB). In addition to Pengambengan, a fishing port modernisation programme is also underway at PPN Kejawanan in Cirebon.
Source: jawawa.id (https://jawawa.id/newsitem/trenggono-prepares-pengambengan-ppn-to-become-a-world-class-port-1790686858)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5763531/trenggono-siapkan-ppn-pengambengan-jembrana-jadi-pelabuhan-kelas-dunia), translated from Indonesian