Indonesian Political, Business & Finance News

Transportation Agency prepares traffic diversions ahead of Serayu Bridge repairs

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
Transportation Agency prepares traffic diversions ahead of Serayu Bridge repairs
Image: Antara (Indonesian)

Purwokerto (ANTARA) - The Banyumas Regency Transport Department (Dinhub), Central Java, is preparing traffic engineering and vehicle diversions ahead of the scheduled repair works for the Serayu Bridge, located on the border of Banyumas and Kalibagor Districts, which are set to take place from 15 to 30 June 2026.

“We have requested the Commitment Making Officer (PPK) to ensure that all facilities related to the implementation of traffic engineering are ready, including directional signs and personnel to direct vehicles, especially heavy vehicles,” said the Head of the Traffic Division of the Banyumas Regency Transport Department, Arif Ahmadi, in Purwokerto, Banyumas, on Thursday.

According to him, the installation of diversion signs has been carried out at several strategic points following coordination with the Traffic Unit (Satlantas) of the Banyumas City Police Resort (Polresta).

He stated that large vehicles, including buses, will be diverted via alternative routes while the bridge repair work is underway.

In this regard, vehicles travelling from the direction of Banjarnegara/Wonosobo towards Jakarta or Bandung will be diverted from the Klampok Three-Way Intersection, Banjarnegara, to pass through Purbalingga and Sokaraja before continuing their journey westward.

Meanwhile, large vehicles from the direction of Kebumen/Yogyakarta heading towards Purwokerto/Jakarta will be prohibited from passing through the Banyumas District once they reach the Buntu intersection and will instead be diverted via Rawalo.

The installation of road notices regarding the diversions has also been implemented at several other intersections, such as Patikraja (Patikraja-Kaliori/Kalibagor route), Tanjung, and Sokaraja (Sokaraja-Kalibagor/Kaliori route), to prevent large vehicles from entering road sections affected by the closure.

“Small vehicles can still pass through the Banyumas-Mandirancan section. Our primary concern is the overflow of vehicle traffic onto district roads which have limited width,” he said.

He admitted that he could not yet estimate the extent of the increase in vehicle volume on alternative routes, particularly the Patikraised-Rawalo section, which frequently experiences traffic congestion due to level railway crossings.

However, his department has coordinated with various parties to anticipate potential traffic congestion.

Furthermore, he noted that a team from the Faculty of Engineering at Jenderal Soedirman University (Unsoed) is currently conducting a study on the impact of these traffic engineering measures to provide input for managing vehicle flow during the works.

He added that the Mandirancan-Banyumas section, which is a district road, is receiving special attention as it is expected to handle additional traffic flow during the bridge closure.

Nevertheless, he stated that the Transport Department has installed portals at several points over the past few days to prevent large vehicles from entering district roads that do not match their capacity.

“We are anticipating that large vehicles will not enter narrow district roads. In addition to limited road capacity, public safety is our main concern,” he said.

Regarding the planned repairs for the Serayu Bridge in Banyumas, he stated that the Banyumas Transport Department, together with the Banyumas City Police Traffic Unit, will conduct a traffic engineering trial on Friday (12/6) as a simulation before the full closure is implemented.

The trial is scheduled to take place from 08:00 to 11:00 WIB and continue from 16:00 to 18:00 WIB, although the implementation remains tentative and subject to field conditions.

According to him, the trial is being conducted to provide a clear picture for the contractors and to assist the Transport Department and the Police Traffic Unit in identifying necessary steps should traffic obstructions occur during the bridge closure.

“We want to ensure that when the closure is implemented, the impact on public mobility is minimised and traffic management can be carried out quickly and accurately,” said Arif.

More from 11 June 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/transportation-agency-prepares-traffic-diversions-ahead-of-serayu-bridge-repairs-1781161382)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5603627/dinhub-siapkan-pengalihan-arus-jelang-perbaikan-jembatan-serayu), translated from Indonesian
Print