Transport Minister Keeps Jakarta MRT Route to South Tangerang Under Wraps
The government has not disclosed details of the Jakarta MRT route to South Tangerang. One reason is the risk of land speculation if the route’s locations are announced too early. The government has chosen to wait for the feasibility study to progress before providing the public with more detailed information.
“Let’s not do that, or land prices will rise. People will buy land there and we’ll have a problem,” Transport Minister Dudy Purwagandhi joked, CNBC Indonesia reported on Sunday (11 October 2026).
The concern is that information about the route could affect land prices nearby. Residents or investors might buy plots in advance in the expectation that the MRT will pass through the area.
The government believes this could push land costs far above initial estimates, potentially undermining the project’s economic viability. “It may not be announced. If people find out, something that cost ten could become a thousand, and then it won’t happen,” Dudy said.
The South Tangerang line is currently at the feasibility-study stage. Sinar Mas is conducting the study to assess the viability of building a line from Lebak Bulus to South Tangerang.
The government cannot yet confirm which locations will be included, as the study is still under way. The final decision must also take into account whether the project can be built economically. “The private sector has to calculate whether it can build this on an economically viable basis,” Dudy said.
Feasibility study being conducted by Sinar Mas
The proposed MRT line to South Tangerang remains at the feasibility-study stage, and the government cannot yet say when its route will be announced publicly.
It is not yet certain whether areas such as Pondok Cabe or Bintaro will be included. The route will depend on the study, an important step before the project can proceed to construction. The government is awaiting its findings on whether a line from Lebak Bulus to South Tangerang is viable.
“The South Tangerang MRT is currently undergoing a feasibility study by Sinar Mas. A feasibility study,” Dudy said.
The study’s findings will inform whether the project proceeds. As it is being undertaken by a private company, the government has not set a deadline for construction. Dudy said the government hoped the process would not take too long, but a construction decision must await the study’s assessment of the project’s viability.
“We will of course look at the results of their feasibility study and how far they believe a line from Lebak Bulus to South Tangerang is feasible to build,” he said.
As a result, the public has no certainty about when the South Tangerang MRT route will be announced. Details may also change in light of the ongoing study.
The government has set no specific target for the project. Its current hope is that the study will soon establish whether construction is viable. “As this is a project being undertaken by the private sector, we are not setting a target,” Dudy said.
The project will require careful assessment before construction begins. In addition to technical considerations, the private sector must ensure that it has a sound economic basis. “We hope it will be viable and can be carried out quickly,” Dudy said.
Source: jawawa.id (https://jawawa.id/newsitem/transport-minister-keeps-jakarta-mrt-route-to-south-tangerang-under-wraps-1791723036)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20261010230511-4-775022/menhub-bisik-bisik-rute-mrt-jakarta-tembus-tangsel), translated from Indonesian