Transport Minister Evaluates Congestion on East Cross Road Return Flow in Ketapang, Lampung
South Lampung (ANTARA) - Transport Minister Dudy Purwagandhi stated that he will evaluate the congestion on the access road along the East Cross Road in Ketapang Subdistrict, South Lampung, particularly at the point where vehicle flows meet en route to the port during the 2026 Eid transport period. He said the government will coordinate with the Ministry of Public Works (PU) and Jasa Marga to anticipate such obstacles in the next Eid transport period. “If it’s the East Cross Road, we will coordinate with PU to anticipate access from the toll road exit as well as the road conditions themselves,” Dudy said after inspecting the Eid return flow at Bakauheni Port, Lampung, on Saturday. According to him, the congestion occurred due to the high volume of vehicles converging at one point, namely the flow of returnees, vehicles from the toll road, and logistics traffic heading to the port area. “Indeed, we see that the surge in returnees is quite large, so congestion is unavoidable. Later, we will convey to Jasa Marga and the Ministry of PU how to address access, especially the exit from that toll road. That is the evaluation we will carry out,” he stated. Previously, congestion on that route occurred when queues of logistics vehicles heading to the supporting port of PT Sumur Makmur Abadi (SMA) in Sumur Village, Ketapang Subdistrict, stretched for about five kilometres. Several trucks carrying fruits, vegetables, and food supplies were reported to be stuck in long queues, while some vehicles were diverted to other ports to help ease the density.
Source: jawawa.id (https://jawawa.id/newsitem/transport-minister-evaluates-congestion-on-east-cross-road-return-flow-in-ketapang-lampung-1774716646)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5498522/menhub-evaluasi-kemacetan-arus-balik-lintas-timur-ketapang-lampung), translated from Indonesian