Indonesian Political, Business & Finance News

TNI Builds Suspension Bridge in Aceh's Reje Payung Village

| Source: Antara (Indonesian) Translated from Indonesian | Infrastructure
TNI Builds Suspension Bridge in Aceh's Reje Payung Village
Image: Antara (Indonesian)

TNI, Polri, ministries and agencies, civil elements and private donors have all contributed, and continue to contribute, their efforts and ideas to accelerate recovery in Aceh.

Jakarta (ANTARA) - The Post-Disaster Rehabilitation and Reconstruction Task Force (PRR) for Sumatra has said that TNI soldiers are currently building a suspension bridge in Reje Payung Village, Linge District, Central Aceh Regency, Aceh.

For this reason, Safrizal, Head of the PRR Regional Post, expressed appreciation for the TNI soldiers building the bridge. He also commended Polri, ministries and agencies, and other stakeholders who continue to cooperate on post-disaster rehabilitation and reconstruction in Sumatra.

“TNI, Polri, ministries and agencies, civil elements, private donors — all of them have been, are, and continue to work together, contributing their energy and ideas to accelerate recovery in Aceh. I give my appreciation to all of them, including the comrades who are currently building the Garuda pioneer bridge in Linge,” Safrizal said in a statement confirmed in Jakarta on Sunday.

As a result, he said, the bridge will connect Reje Payung Village with Jamat Village in Linge District.

In addition, he said, pupils of SDN 10 Linge, who are currently divided into two learning groups — one at the main school and one at an emergency tent on the other side of the river — will be reconnected.

“Let us pray to Allah to make all matters easier,” he added.

The construction of the pioneer bridge involves three personnel from Koramil 05/Linge, twelve personnel from the 854/Dharma Kersaka Territorial Development Battalion (Yon TP 854/DK), headquartered in Pameu, Central Aceh, one engineering support personnel from the Iskandar Muda Regional Military Command, and three local residents.

Meanwhile, as of 25 July 2026, construction has entered the stage of installing floor planks and tightening the hanger posts.

More from 26 July 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/tni-builds-suspension-bridge-in-acehs-reje-payung-village-1785055991)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5666583/satgas-prr-tni-bangun-jembatan-gantung-di-kampung-reje-payung-aceh), translated from Indonesian
Print