Tito Ensures Safety Prioritised in Bener Meriah Infrastructure Development
The Head of the Post-Disaster Rehabilitation and Reconstruction (PRR) Task Force for Sumatra, Muhammad Tito Karnavian, has ensured that infrastructure development in Bener Meriah prioritises public safety. Tito made this statement during a direct inspection of road and bridge repair projects affected by disasters in the region.
During the visit, he expressed his appreciation for the community’s self-help efforts, where residents worked together to build the Enang-Enang Bridge to maintain daily mobility.
However, based on discussions with technical teams, the condition of the Enang-Enang Bridge was deemed insufficiently safe, particularly for heavy vehicles. Consequently, the government will immediately strengthen the bridge’s structure so that all types of vehicles can pass through safely.
“The Enang-Enang Bridge will remain functional, but its technical structure will be reinforced and studied by the Public Works Office (Balai PU),” said Tito after inspecting the site in Bener Meriah Regency, Aceh, on Tuesday (7/7/2026).
For the time being, the Enang-Enang Bridge is only permitted to be traversed by two-wheeled vehicles and light vehicles. Meanwhile, permission for heavy tonnage vehicles must await the results of a technical study by the Aceh National Road Implementation Agency (BPJN).
To ensure compliance with these regulations, the local government will install barrier portals around the location to prevent heavy vehicles from attempting to cross.
Tito explained that this policy represents the most rational middle ground. The step was taken to balance the urgent need for community mobility with the paramount importance of safety.
The government is striving to ensure that the daily activities of residents are not disrupted, while simultaneously avoiding fatal risks should the bridge’s condition not yet be declared fully stable and safe.
“We do not want an accident to occur that leads to a collapse,” Tito emphasised.
Tito acknowledged his understanding of the community’s aspirations to continue using the Enang-Enang Bridge. The bridge serves as a vital artery for accessing schools, economic hubs, and various public services.
If this route were to be closed entirely, forcing residents to take much longer detours, it would significantly increase daily transportation costs.