The 'Curve 23' Route on the South Coast Road: Its Significant Impact on Yogyakarta
The Ministry of Public Works (PU) has begun a seven-day ‘open traffic’ trial for the new Kretek-Girijati road, running from 14 to 20 September 2026, following the completion of the section connecting Bantul and Gunungkidul Regencies. The construction of this road is part of the development of the Southern Cross Road (JJLS), also known as the South Coast (Pansela) route in the Special Region of Yogyakarta (DIY).
Minister of Public Works Dody Hanggodo stated that the development of the Pansela route is part of the government’s efforts to improve connectivity and establish new economic growth centres in the southern region of Java.
“The South Coast route can serve as an alternative travel path for the public. In addition to helping reduce congestion on northern routes and the Trans-Java Toll Road, this route holds significant tourism potential as it passes through the southern coastal areas of Java,” said Dody.
The 5-kilometre Kretek-Girijati New Road has been completed since 28 August 2026. The construction of this road, which features 23 bends—earning it the nickname ‘Curve 23’—was carried out through the Central Java-DIY National Road Implementation Office (BBPJN).
Traffic Management During the Trial Period
Consequently, this trial period serves as a crucial stage to monitor traffic conditions and evaluate the road’s readiness before it is permanently opened for wider public use.
During the open traffic trial, passing vehicles are restricted to a maximum of four-wheel vehicles (R4). Furthermore, operational hours are limited to 06:00–18:00 WIB. These restrictions are in place because supplementary works are still ongoing on the 980-metre stretch of the Kretek-Girijati Lot 17A package, located at the end of the new road section.
The introduction of the Kretek-Girijati New Road is expected to provide strategic benefits for connectivity in the southern region of DIY. The route is intended to reduce the traffic load on northern road networks while simultaneously increasing accessibility to coastal tourism areas.
In line with the primary objectives of PU608, the Ministry of Public and Public Works remains committed to completing reliable and high-quality infrastructure development to maintain connectivity and support economic growth and public welfare.
Source: jawawa.id (https://jawawa.id/newsitem/the-curve-23-route-on-the-south-coast-road-its-significant-impact-on-yogyakarta-1789829459)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260919184612-4-769245/ada-jalur-kelok-23-di-pansela-ini-efek-dahsyatnya-ke-yogyakarta), translated from Indonesian