Surabaya Regional House of Representatives Chairman Urges Acceleration of Road Infrastructure Development
When roads are adequate and meet the necessary requirements, economic movement will accelerate.
Surabaya (ANTARA) - The Chairman of the Surabaya Regional House of Representatives (DPRD), Syaifuddin Zuhri, is pushing for the accelerated development of road infrastructure, such as the Wiyung-Menganti road widening project.
“The acceleration of road construction is not only related to traffic flow but also influences economic movement between regions,” he stated in Surabaya on Friday.
Kaji Ipuk, his familiar nickname, said that the development and capacity enhancement of roads are part of urban planning to ensure better connectivity between areas.
“When roads are adequate and meet the required standards, economic movement will accelerate,” he said.
Conversely, traffic congestion is believed to impact economic activities as travel time and distribution costs increase. Therefore, connectivity between Surabaya and its surrounding areas needs to be continuously strengthened.
He cited the Wiyung-Menganti corridor as an important access point between Surabaya and the Gresik region. Strengthening the road network in this area is seen as a way to smooth the exchange of economic activities between the regions.
“As Surabaya connects to Gresik, facilitating economic exchange and so on, we must prioritise these roads. This is equivalent to preparing ourselves towards economic independence and strength,” he remarked.
He noted that the widening of the Wiyung-Menganti road should also be viewed in the context of its connection to the West Outer Ring Road (JLLB). This connectivity is expected to accelerate movement from the western part of Surabaya to strategic road networks, including access to the Teluk Lamong Port area.
According to him, several of these infrastructure projects experienced delays due to the COVID-19 pandemic and various construction obstacles. Therefore, he requested that projects already planned and needed by the community should not be halted again.
“The targets for the Wiyung road and the JLLB have been in place for a long time. The target during my time as Chairman of the Commission was completion by 2023. However, there was COVID-19 and other factors,” he said.
Kaji Ipuk emphasised that infrastructure development designed by the government must have a certainty of completion so that the benefits can truly be felt by the community.
“In Mr Eri’s era, everything must be completed. It must be finished,” he concluded.
Source: jawawa.id (https://jawawa.id/newsitem/surabaya-regional-house-of-representatives-chairman-urges-acceleration-of-road-infrastructure-development-1789128502)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5736755/ketua-dprd-surabaya-dorong-percepatan-pembangunan-infrastruktur-jalan), translated from Indonesian