Supporting Waste Management, PLN Ready to Absorb Electricity from Legok Nangka PSEL
PT PLN (Persero) is supporting the government’s sustainable waste management programme by purchasing electricity generated from the Legok Nangka Waste-to-Energy (PSEL) facility in Bandung Regency, West Java. The PSEL project, which has entered the construction phase, is targeted to begin operations in 2029 and is capable of processing up to 2,131 tonnes of waste per day, generating an electricity capacity of 40.79 megawatts (MW) or reaching 310 gigawatt-hours (GWh) per year.
As part of the support for the project’s development, PLN signed a Power Purchase Agreement (PJBL) in March 2026 with PT Jabar Environmental Solutions (PT JES), the project implementing body appointed by the West Java Provincial Government. Through this agreement, the electricity produced by the Legok Nangka PSEL will be distributed into PLN’s electricity system for public use.
The Deputy Minister of Energy and Mineral Resources, Yuliot, stated that the Legok Nangka PSEL is part of the government’s efforts to accelerate urban waste management while developing waste-to-energy capabilities. This project aligns with President Prabowo Subiante’s directive to resolve waste issues before 2029 through upstream-to-downstream management within the 2025-2029 National Medium-Term Development Plan (RPJMN).
“Today’s groundbreaking is not merely marking the start of infrastructure construction, but also serves as a symbol of our shared commitment to realising a cleaner, greener, and more sustainable future for Indonesia,” said Yuliot during the groundbreaking ceremony in Bandung.
He expressed hope that the Legok Nangka PSEL could serve as a model for waste-to-energy projects that can be implemented in various regions, providing environmental and social benefits. With significant generation capacity and investment support, the project is expected to reduce waste volumes, provide clean energy, create jobs, boost regional economic activity, and reduce emissions.
Similarly, the Governor of West Java, Dedi Mulyadi, noted that the Legok Nangka PSEL is a long-term solution for waste issues in the Greater Bandung area. He emphasised that the project would act as a catalyst for modern waste management systems and improve air and environmental quality. Furthermore, the project is expected to strengthen the clean energy supply necessary to support industrial growth and investment in West Java.
Meanwhile, PLN’s Director of Project Management and New Renewable Energy, Suroso Isnandar, stated that the company is ready to execute government directives by supporting the PSEL as a solution to the waste emergency and a step towards energy self-sufficiency. The agreed 20-year Power Purchase Agreement (PJBL) represents PLN’s commitment to ensuring the project’s long-term sustainability by providing certainty in electricity off-take.
Suroso added that beyond strengthening the clean energy mix, the development of the Legok Nangka PSEL demonstrates how the electricity sector can contribute to solving environmental issues. “Through PSEL, we are not only preserving the environment for the future, but also generating useful electricity for the community. This is renewable energy that will continuously cycle as long as there is waste to be processed,” he concluded.
Source: jawawa.id (https://jawawa.id/newsitem/supporting-waste-management-pln-ready-to-absorb-electricity-from-legok-nangka-psel-1785480888)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260731123730-4-755411/dukung-pengelolaan-sampah-pln-siap-serap-listrik-psel-legok-nangka), translated from Indonesian