South Aceh Accelerates Infrastructure Improvements Ahead of Rainy Season
The South Aceh Regency Government is accelerating the use of additional regional transfer funds (TKD) to improve a number of basic infrastructure projects. The move is intended to ensure priority works can be completed before the rainy season arrives.
The regency government is targeting infrastructure budget realisation from the additional TKD to exceed 50 percent by August 2026. This is expected to allow the benefits of development to be felt more quickly by the public.
Of South Aceh’s additional TKD of approximately Rp51.6 billion, some Rp26.1 billion has been allocated to the infrastructure sector. To date, realisation has reached Rp9.9 billion, or around 37.9 percent of the total allocation.
Acting Head of the South Aceh Public Works and Spatial Planning Agency, Skar Fharaby, said the budget is being used for a number of priority works.
The projects include normalisation of the Krueng Trumon river, construction of a bridge in Seuneubok Puntho, and development of an irrigation network in Padang Harapan village.
“The target for this August is above 50 percent if possible, so that the budget is absorbed quickly and on-site works are completed promptly. The rainy season is approaching, so all works need to be accelerated,” Skar said in a statement quoted on Sunday (16/8).
Normalisation of the Krueng Trumon is one of the most urgent works because the river plays an important role in channelling water to rice farming areas. Addressing siltation is expected to improve water flow, reduce the risk of overflow, and protect residents’ agricultural activities.
Flood control efforts are also being strengthened through the construction of 3,800 metres of drainage in Padang Harapan village. The infrastructure is expected to channel standing water more quickly and reduce the recurring flood threat that has occurred whenever rainfall intensity increases.
Padang Harapan resident Nur Diayati (43) expressed hope that the development would provide a solution for residential areas that are frequently inundated.
“Hopefully, once the drainage is in place, our village will no longer flood. Flooding has occurred almost every year. With the drainage, we hope water can flow directly away,” she said.
Field Coordinator for the Padang Harapan Drainage Project, T. Chairumansyah, said the work has a budget value of around Rp59 billion. Similar projects are also being carried out in five regencies and cities across Aceh with a total value of around Rp285 billion.
The Post-Disaster Rehabilitation and Reconstruction Acceleration Task Force (Satgas PRR) for Sumatra is supporting the South Aceh Regency Government’s efforts by overseeing work progress and the realisation of the additional TKD. Overall, utilisation of South Aceh’s additional TKD has reached Rp24.8 billion, or 48.04 percent of the approximately Rp51.6 billion allocation.
Aceh Satgas PRR representative from the Ministry of Home Affairs, Imran, expressed hope that the accelerated works would strengthen protection for communities from subsequent flooding.
“When water levels rise, we hope the flow can be contained and distributed properly so that it does not overflow or inundate roads,” Imran said.
The Satgas PRR is also encouraging the normalisation of the Krueng Trumon to be supported by the construction of an Armco bridge to strengthen connectivity and the economic mobility of residents.
Source: jawawa.id (https://jawawa.id/newsitem/south-aceh-accelerates-infrastructure-improvements-ahead-of-rainy-season-1786855886)
Originally published by CNN Indonesia (https://www.cnnindonesia.com/nasional/20260816101340-25-1392886/aceh-selatan-percepat-pembenahan-infrastruktur-jelang-musim-hujan), translated from Indonesian