Indonesian Political, Business & Finance News

SKK Migas Targets Realisation of Production Potential Through 12 Wells

| Source: Antara (Indonesian) Translated from Indonesian | Energy
SKK Migas Targets Realisation of Production Potential Through 12 Wells
Image: Antara (Indonesian)

Sanur, Bali (ANTARA) – The Special Task Force for Upstream Oil and Gas Business Activities (SKK Migas) is targeting the realisation of around 80 per cent of its pre-drill resource target through 12 high-impact, or high-potential, wells.

“In 2026, we have 12 high-impact wells, representing around 31 per cent of the total drilling plan but accounting for about 80 per cent of the estimated pre-drill resource target,” SKK Migas Deputy for Exploration, Development and Working Area Management Rikky Rahmat Firdaus said at the ASEAN Council on Petroleum (ASCOPE) 2026 in Sanur, Bali, on Monday.

The pre-drill resource target is 2.6 billion barrels of oil equivalent (BBOE). Rikky said the 12 high-impact wells are expected to deliver 2.2 BBOE, or about 80 per cent of that target.

According to SKK Migas records, Pertamina is managing five high-potential wells: Besar-1 (Pertamina East Natuna/PEN); Banyu Geni-01 (Pertamina EP/PEP); Wijaya Kusuma-1 (PEP); Padang Pancuran-002 (PEP); and Tingkilan-1 (Pertamina Hulu Energi Lepas Pantai Bunyu/PHE LPB).

“By mid-November, we are looking forward to Petronas and Total E&P drilling a well in the Bobara Block, located near Papua,” Rikky said.

For 2027, Rikky estimated potential pre-drill resources, or reserves with production potential, at around 2.63 million barrels of oil equivalent.

“This figure is still an estimate, not a confirmed discovery or proven reserve,” Rikky said.

Ultimately, Rikky added, exploration success is determined not only by ambitious targets, but also by disciplined execution and the availability of high-quality subsurface data that reveals Indonesia’s exploration potential.

More from 26 October 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/skk-migas-targets-realisation-of-production-potential-through-12-wells-1793004976)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5812075/skk-migas-bidik-realisasi-potensi-produksi-lewat-12-sumur), translated from Indonesian
Print