Indonesian Political, Business & Finance News

Semarang Mayor Accelerates Construction of Five Reservoirs to Strengthen Flood Control

| Source: detikcom Translated from Indonesian | Infrastructure
Semarang Mayor Accelerates Construction of Five Reservoirs to Strengthen Flood Control
Image: detikcom

Semarang Mayor Agustina Wilujeng is accelerating the construction of five priority reservoirs and retention ponds. This move is part of a long-term strategy for flood and inundation control, especially in the eastern part of Semarang City. The five reservoirs are part of 20 potential reservoir and retention pond sites that have been mapped in the East Semarang System. Their construction is designed to strengthen the flood control system, which has so far been carried out through channel normalisation, drainage construction, and the operation of pump houses.

Agustina stressed that flood management is one of her administration’s top priorities. She has instructed all regional apparatus to accelerate the planning and implementation process for the reservoir construction so that the benefits can be felt immediately by the community. ‘Flooding is a problem that Semarang City has faced for years. Therefore, its resolution cannot be merely short-term,’ Agustina said in a statement on Friday (10/7/2026). She also emphasised the importance of building a more comprehensive flood control system, ranging from strengthening drainage, optimising pumps, normalising rivers, to constructing integrated reservoirs.

According to her, the construction of reservoirs is an infrastructure investment that is beneficial for reducing flood risk. This development can also increase water reserves, support environmental resilience, and provide open spaces that benefit the community. Agustina affirmed that the Semarang City Government continues to prioritise an integrated approach in flood management. ‘This work requires a process, but the most important thing is that the policy direction is clear. The Semarang City Government will continue to oversee the reservoir construction in stages until all mapped points can be realised,’ she asserted.

Meanwhile, the Head of the Semarang City Housing and Settlement Area Agency (Disperkim), Murni Ediati, explained that the five reservoirs have different priority levels according to technical readiness, handling needs, and budget support. The Dung Tungkul Reservoir in Rowosari Urban Village, Tembalang District, is the first priority. With an area of 6.47 hectares and a capacity of 120,000 cubic metres, its investment value reaches approximately Rp 56.75 billion, making it a key strategic project in the East Semarang flood control system. The reservoir is projected to reduce the peak flow of the Babon River by up to 14.35 percent and decrease inundation covering an area of about 3.3 hectares in the Meteseh and Rowosari areas.

The second priority is the Sembungharjo Reservoir in Genuk District, covering an area of 1.74 hectares with a capacity of 52,240 cubic metres, at an estimated cost of Rp 12.5 billion. This reservoir is included in the 2026 inundation management plan and is expected to require support for integrated tertiary channel construction worth approximately Rp 38.7 billion for the Sembungharjo and Karangroto areas. Next is the Graha Estetika Reservoir in Pedalangan Urban Village, Banyumanik District, valued at Rp 6 billion. This reservoir is prioritised to reduce inundation in the Sirojudin intersection and South Tembalang areas.

Meanwhile, two retention ponds in Muktiharjo Kidul Urban Village, Pedurungan District, are the fourth and fifth priorities. The Muktiharjo Kidul 1 Retention Pond is valued at Rp 4.98 billion, the Muktiharjo Kidul 3 Retention Pond at Rp 1.98 billion, and the construction of connecting inlet and outlet channels for the Muktiharjo Kidul area is valued at Rp 10.835 billion. She revealed that the five reservoirs are projected to reduce potential inundation and flooding in urban villages that have been affected by floods, such as Meteseh, Rowosari, Sembungharjo, Karangroto, Tembalang, and Muktiharjo Kidul. This infrastructure is also projected to reduce the flood risk that previously affected up to 23 urban villages. ‘We work based on a priority scale by considering the size of the water catchment area and the magnitude of the resulting flood impact,’ she concluded.

More from 10 July 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/semarang-mayor-accelerates-construction-of-five-reservoirs-to-strengthen-flood-control-1783677247)
Originally published by detikcom (https://news.detik.com/berita/d-8568450/perkuat-pengendalian-banjir-walkot-semarang-kebut-pembangunan-5-embung), translated from Indonesian
Print