Securing the Planting Season: Ministry of Public Works Strengthens Water Supply for 3,330 Hectares of Rice Fields in East Java
The Ministry of Public Works (PU) is undertaking several steps to maintain water availability for 3,330 hectares of agricultural land in East Java affected by long droughts or El Niño. These efforts include the deployment of pumps, the provision of boreholes, and the normalisation of irrigation channels.
The Minister of Public Works, Dody Hanggodo, emphasised that the Ministry continues to push various initiatives to ensure water availability for agricultural land during drought conditions. “We must ensure that farmer productivity does not decline, even in drought conditions,” Dody stated in a written release on Monday (5/10/2026).
Based on findings from the Brantas River Basin Organisation (BBWS) as of 3 October 2026, there are 3,330 hectares of agricultural land across several regions in East Java requiring irrigation support to maintain productivity and the sustainability of the planting season. This area consists of 2,592 hectares of land requiring water supply support to maintain crop productivity, and 738 hectares requiring water support to facilitate the planting season.
BBWS Brantas has prepared 73 interventions to strengthen the water supply for agricultural land and support planting season needs. These efforts include channel maintenance, increasing flow rates or regulating water rotation, operating pumps, and providing deep and shallow boreholes.
One such intervention is being carried out in Pamorah Village, Tragah District, Bangkalan Regency. The Ministry of Public Works has repaired two units of machines and pumps with a capacity of 175 litres per second, which had been out of operation for a long time. This step is intended to strengthen the water supply for the Pamorah Dam Irrigation Area, which serves approximately 250 hectares.
Similar measures are being taken in Trenggalek Regency, specifically in Ngadisuko Village, Durenan District, where one turbine pump unit with a capacity of 30 litres per second has been deployed. This pump is used to help meet the water needs for rice and secondary crop (palawija) fields covering 20 hectares.
A similar intervention was implemented in Bangunmulyo Village, Pakel District, Tulungagung Regency, where one turbine pump unit with a capacity of 30 litres per second was deployed to assist in irrigating 20 hectares of rice and secondary crop fields.
Meanwhile, in Sidoarjo Regency, the Ministry of Public Works is addressing water supply limitations in Balongdowo Village, Candi District. BBWS Brantas is drilling two shallow borehole points to find alternative water sources for agricultural land that has not yet received optimal water supply.
The intervention in Balongdowo is necessary because the flow rate from the Ngaban Dam has decreased, preventing water from reaching the end of the network. By providing alternative water sources, the Ministry of Public Works aims to strengthen the water supply to ensure the irrigation needs of agricultural land are met.
Through these various interventions, the Ministry of Public Works continues to strengthen irrigation services and maintain water availability for agricultural land in East Java. This step is part of the Ministry’s broader efforts to support national food self-sufficiency by ensuring that water resource infrastructure remains functional and that farmers’ irrigation needs are met despite the prolonged drought.
Source: jawawa.id (https://jawawa.id/newsitem/securing-the-planting-season-ministry-of-public-works-strengthens-water-supply-for-3-330-hectares-of-rice-1791212148)
Originally published by detikcom (https://news.detik.com/berita/d-8693718/jaga-musim-tanam-kemenpu-perkuat-pasokan-air-untuk-3-330-ha-sawah-di-jatim), translated from Indonesian