Sarawak's 12-dam Plan Not Set in Stone
The Straits Times (Singapore)
Teo Cheng Wee Regional Correspondent
Could be shelved if current plants can produce enough power
KUALA LUMPUR - A controversial plan to build 12 dams in Sarawak's interior may be shelved if existing plants can produce enough power, a state minister said.
As the issue threatens to hurt the ruling Barisan Nasional's (BN's) chances at the upcoming general election, Sarawak's minister of land development, Tan Sri Dr James Masing, said the plan for the dams - first revealed publicly in 2008 - was never set in stone.
"They're possible sites for Sarawak's hydroelectric power plan for the next 20 to 30 years. We may not need all of them. In 20 years, there may be other sources of energy," he told The Straits Times yesterday.
The dams are part of a master-plan by the state government to develop Sarawak's economy, by harnessing its abundant energy resources to generate cheap electricity, and attract investments from energy-intensive industries.
The East Malaysian state is one of the poorest in the country. The Batang Ai and Bakun dams are already functional, with a third - Murum
- nearing completion.
The authorities refute claims by critics that the dams are over- producing power. Deals have been signed to sell the electricity generated by Bakun and part of Murum's supply to neighbouring Indonesia and metals plants in Sarawak, said state-owned power provider Sarawak Energy (Sesco).
This works out to about 2,300MW of power demand currently. This is expected to rise to 6,500MW by 2020, said Sesco.
But the dams have displaced thousands of indigenous people, and anger environmentalists as they destroy jungle and wildlife.
In recent months, activists and locals have staged numerous blockades at the dam sites, in an attempt to halt future projects.
Dr Masing's own Parti Rakyat Sarawak - a BN component party - could lose the support of voters as a result. Several of his party's seats are in these rural locations.
"If the need arises, we may build two more dams at Baleh and Baram. But it's a misunderstanding to assume we'll build on all 12 sites. I don't know why the media thinks we're doing this," he said.
The "main concern is not politics", he added. "We're trying to do things properly."
But Dr Masing's statement has been greeted with scepticism by some activists. In a state where Chief Minister Taib Mahmud maintains tight control on most affairs, such statements remain unreliable unless it comes from the top, said Mr Philip Jau, a committee member of NGO Save Sarawak Rivers and chairman of the Baram Protection Action Committee.
"When the government built the Bakun dam, they told locals it would bring employment, but it didn't because the dam required skilled labour which they can't provide," said Mr Jau. "So now, they're displaced from their traditional land and living in poorer conditions than before."
He has been keeping a close watch on activities in his hometown of Baram, which is undergoing social and environmental impact assessment for dam building.
"We're not against development and progress, but it must be for the people," he said.
chengwee@sph.com.sg
Source: jawawa.id (https://jawawa.id/newsitem/sarawaks-12-dam-plan-not-set-in-stone-1360342800)
Originally published by The Straits Times (http://www.straitstimes.com/the-big-story/asia-report/malaysia/story/sarawaks-12-dam-plan-not-set-stone-20130209)