Saka Energi Secures PoD for Ronggolawe Oil and Gas Block, Production Set for 2029
PT Saka Energi Indonesia (SAKA), an upstream oil and gas company and part of Pertamina’s Gas Subholding, has obtained approval for the Plan of Development (PoD) of the Ronggolawe - PHE-7 field in the Pangkah Working Area from SKK Migas. The field is targeted to begin production (onstream) by the end of 2029.
“This PoD approval is a significant step in SAKA’s efforts to accelerate the development of oil and gas resources into production that provides added value to the Company,” stated SAKA’s Director of Exploration and Development, Fuji Koesumadewi, in a written statement on Thursday.
She noted that the PoD approval was supported by comprehensive analysis results from the RGL-3 well, providing a strong technical foundation for the field development plan. Previously, in 2025, SAKA submitted the Determination of Exploration Status (PSE) documents for the Ronggolawe field, following the successful hydrocarbon discovery in the RGL-1 exploration well in 2012, which was later confirmed through appraisal activities at the RGL-3 well in 2024 within the Pangkah Working Area.
The Ronggolawe field is projected to contribute production of up to 5,126 barrels of oil per day (BOPD) at its peak. Overall, the field is estimated to hold resources of up to 10 million barrels of oil that can be utilised until the end of the cooperation contract, which is expected to support national oil and gas production enhancement efforts.
Hydrocarbons in the Ronggolawe Structure were identified within the CD Carbonate layer. This potential was proven through a series of technical evaluations, including Drill Stem Tests, reservoir pressure testing, and fluid sample analysis.
The evaluation results indicate a prospective field for further development. Under the approved development plan for the Ronggolawe - PHE-7 field, four development wells will be drilled and subsequently connected to existing production facilities in the Pangkah Working Area via a subsea pipeline network.
The development of the Ronggolawe - PHE-7 field is a unitisation strategy between the Pangkah Working Area and the West Madura Offshore (WMO) Working Area, operated by Pertamina Hulu Energi WMO. This aligns with SAKA’s efforts to optimise production in the Pangkah Working Area while accelerating the monetisation of exploration findings into producing fields.
“In its implementation, SAKA will continue to prioritise cost efficiency and operational effectiveness, while maintaining high standards of occupational safety and environmental protection,” Fuji added.
With the support of stakeholders and partners, the development of the Ronggolawe - PHE-7 field is expected to become a driver for both company and national oil and gas production growth. Furthermore, SAKA is committed to ensuring that every development provides sustainable benefits for the environment and the communities surrounding the operational areas.
Source: jawawa.id (https://jawawa.id/newsitem/saka-energi-secures-pod-for-ronggolawe-oil-and-gas-block-production-set-for-2029-1781164312)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260611131154-4-742006/saka-energi-kantongi-pod-blok-migas-ronggolawe-produksi-2029), translated from Indonesian