RI Proposes Limits for Coal Industry
The Jakarta Globe By Tunggadewa Mattangkilang
The national government has announced plans to reduce coal production and renegotiate contracts with miners to prevent Indonesia’s coal reserves from depleting to the extent that the country relies on imports of the energy source by 2050.
Energy and Mineral Resources Deputy Minister Susilo Siswo Utomo said his ministry hoped to renegotiate contracts and investment and curb production so that future generations could benefit from the natural resource.
“Capping production should not be translated as an effort to create problems for entrepreneurs. It’s true that it will have impacts in the short term but we have to think about the future, put the state before [our own interests],” Susilo said in Balikpapan, East Kalimantan, on Tuesday.
“Balance among production, exports and fulfilling domestic needs is required. We have to start discussions now on how much we can produce.”
Susilo said the country’s vast natural resources should be a blessing and not create problems for local people.
“Indonesia possesses many natural resources, from mining [sites], to oil and gas, to the sea to the sun. The only thing we don’t have is a sense of unity as citizens of one country,” he said.
Susilo said the total coal reserves in Indonesia stood at an estimated 28 billion tons. Annual production stands at 400 million tons, of which 325 million to 330 million tons are exported, with China and India being the biggest importers.
“We export 77 million tons per year to China and 75 million tons to India. But China’s coal reserve is actually five times higher than Indonesia’s while India’s coal reserve is three to four times higher,” Susilo said.
“We don’t want to be an importer if our coal reserves are depleted in 2050.”
The deputy minister said the mass coal production of recent decades, the country’s single biggest source of income, was mostly exported and would not benefit Indonesia in the long term.
He added that Indonesia needs to calculate the country’s mineral reserves so that future generations can also profit from the commodity.
East Kalimantan Governor Awang Farouk Ishak said he had long recommended reducing coal production in the province from 250 million metric tons to 150 million metric tons, especially since the province has never fully reaped the industry’s rewards. Most of the coal is exported and the remainder is used to fulfil demand for power supplies in Java.
Source: jawawa.id (https://jawawa.id/newsitem/ri-proposes-limits-for-coal-industry-1375117200)
Originally published by The Jakarta Globe (http://www.thejakartaglobe.com/business/govt-proposes-limits-for-coal-industry/)