Repairs on Cracked Jakarta-Merak Toll to Take Weeks
The Jakarta Globe By ID/ Eko Adityo Nugroho
photo: Ongoing repairs to the Jakarta-Merak toll road are likely to cause heavy congestion for the next two to three weeks. (JG/Safir Makki)
Repairs on a segment of the Jakarta-Merak tollway that cracked because of soil movements, will need two to three weeks to complete, the operator of the toll road said on Wednesday.
Indah Permanasari, spokeswoman of toll operator PT Marga Mandala Sakti (MMS), said that the cracks appeared at Kilometer 38 going towards Jakarta on Tuesday afternoon.
Indah said that the damage, occurring over a 50 meter stretch, may have been caused by the unstable state of the soil as well as water infiltration from the nearby Cimanceuri river.
“The cracks may also have been caused by the heavy load of passing vehicles exceeding permissible capacity,” Indah said.
Repair works began at around 6:30 p.m. on Tuesday — about one hour after the cracks appeared — while heavy trucks were diverted to leave the road at Balaraja Barat to enter again at Balaraja Timur.
“For the smaller vehicles, they can still pass through the same road but with the lane narrowed causing some congestion,” Indah said, adding that three-kilometer-long jam had been created because of the road works.
Source: jawawa.id (https://jawawa.id/newsitem/repairs-on-cracked-jakarta-merak-toll-to-take-weeks-1370365200)
Originally published by The Jakarta Globe (http://www.thejakartaglobe.com/news/repairs-on-cracked-jakarta-merak-toll-to-take-weeks/)