Reasons Why Bali Has Ultimately Chosen to Build Battery-Powered Trams
The Bali Provincial Government has finally opted to construct battery-powered electric trams. The planned route will run from I Gusti Ngurah Rai International Airport to the Canggu area in Badung Regency.
The tram mode was selected as a transport concept deemed most suitable for Bali’s characteristics. Unlike MRT or LRT systems, the designed trams will utilise battery technology, meaning they will not require overhead electric cables along the tracks.
The initial prepared route spans approximately 12 km, covering the International Airport-Cante corridor. The track is designed with two lanes and crossing areas to support smooth operations. In terms of size, the trams are designed to be relatively small; the track width is approximately three metres, while the tram dimensions are slightly over two metres, making them smaller than a standard bus.
The development of this tram is projected to be one of the solutions to address traffic density in the Badung area, particularly the Airport-Canggu corridor, which experiences very high mobility. It is estimated that around 150,000 people move through this area daily, with vehicle numbers reaching approximately 80,000 units.
This condition is a primary consideration for the need for a new mass transit mode capable of reducing public dependence on private vehicles while simultaneously improving inter-regional connectivity.
The tram is targeted to support the mobility of both residents and tourists, reduce vehicle congestion, and strengthen connectivity within tourism zones.
At maximum capacity, the tram is projected to transport approximately 15,000 to 20,000 passengers, with a travel time of around 30 minutes. The departure interval between trams is designed to be approximately 10 minutes. If operating at full capacity, the transport capacity is projected to reach around 60,000 passengers per day. This figure is expected to accommodate about 40 per cent of the mobility density on the Airport-Canggu corridor.
Governor of Bali, Wayan Koster, stated that this collaboration is a follow-up to proposals from the Ministry of National Development Planning/Bappenas and the Bali Provincial Government to improve facilities and transport systems in Bali, particularly in the Badung Regency, which faces traffic congestion issues. According to Koster, the tram concept is now becoming more concrete as an alternative to address congestion on the Airport-Canggu route.
However, the construction of this transport must continue to respect the characteristics of Bali. The infrastructure built must not sacrifice beauty, the environment, or the lives of the community.
“Transport development must continue to respect the uniqueness of Bali, maintain its beauty, support tourism, and not disturb the lives of the community,” said Koster, as quoted from the Bali Provincial Government website on Saturday (26/09/2026).
He emphasised that the tram construction must take into account the presence of hotels, tourist accommodations, tourist attractions, the environment, residential areas, and the lives of the people located along the route.
Tourist comfort is also a key focus in the development of this transport mode.
“Tourist comfort must be maintained. The presence of the tram is actually expected to become a new attraction for Balinese tourism,” Koster added.
Based on the initial plan, the groundbreaking for the tram construction is targeted for March 2027. The first route is targeted to begin operations in 2028, while the entire line up to Canggu is targeted for completion and operation by 2029.
Source: jawawa.id (https://jawawa.id/newsitem/reasons-why-bali-has-ultimately-chosen-to-build-battery-powered-trams-1790420098)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260925204006-4-771075/ini-alasan-bali-akhirnya-pilih-bangun-trem-baterai), translated from Indonesian