Public Works Ministry Restores Road Access and Repairs Flood-Damaged Riverbank in Aceh
The Ministry of Public Works, through the Aceh National Road Implementation Agency (BPJN), moved quickly to address a landslide involving large rocks on the Takengon–Isaq road in Central Aceh district, Aceh province, at around 6.50am on Sunday (1 November).
The landslide buried the road on the Takengon–Ise Ise stretch, disrupting traffic in both directions between Takengon and Isaq.
The landslide was triggered by heavy rain that had fallen in the area since Friday (30 October), causing soil and rock to shift around the road. The incident temporarily cut off access for motorcycles, cars and heavy vehicles travelling between Takengon and Isaq.
Public Works Minister Dody Hanggodo said maintaining connectivity was the government’s top priority during a disaster emergency, given the strategic role of roads and bridges in supporting people’s activities and the distribution of logistics.
“Connectivity is the lifeblood of people’s lives. In a disaster, the most important thing is to ensure access remains open so that residents can travel, humanitarian aid can reach them and logistics distribution does not stop,” Dody said in a statement on Monday (2 November 2026).
Aceh BPJN head Zulkarnaini said the agency’s team immediately began clearing the landslide debris as an emergency response, deploying a backhoe loader already at the site. An excavator was also being mobilised to speed up the work.
To ensure road users’ safety during the operation, warning signs have been installed and traffic controllers stationed at both ends of the road, on the Takengon and Isaq sides.
The Ministry of Public Works is also coordinating with the police, particularly Linge sub-district police, and monitoring the condition of the road and nearby road and bridge infrastructure.
Zulkarnaini added that, according to monitoring on Monday (2 November 2026), the road had reopened to motorcycles and four- and six-wheeled vehicles. The Aceh BPJN is continuing to monitor the road and surrounding area because further landslides remain possible, particularly if heavy rain returns.
“The Ministry of Public Works is committed to continuing its response and monitoring conditions on the ground to ensure road users’ safety and maintain connectivity between regions, particularly access from Takengon to Blangkejeren,” Zulkarnaini said.
Residents and road users have been urged to take care when travelling through the affected area, follow instructions from staff on site and remain alert to the risk of further landslides, especially during heavy rain.
Emergency repairs to flood-damaged embankment in Pidie Jaya
Heavy rain also fell in Pidie Jaya district, Aceh province, from 7pm to 10.30pm on Saturday (31 October), causing flooding in several residential areas, particularly Dayah Usen village in Meurah Dua sub-district.
According to incident reports, the intense rain raised river levels, causing rivers to overflow and flood residential areas. Water levels were reported at between 20 and 100 centimetres. The flooding also damaged a riverbank in Dayah Usen village, Pidie Jaya district.
As an emergency measure, the Ministry of Public Works, through the Sumatra I River Basin Agency (BWS), is carrying out temporary repairs and reinforcement of the river embankment using earth fill to build a new barrier. The work is intended to reduce the risk of river water overflowing and protect areas around the affected site.
The equipment required for the work includes one long-reach excavator and one standard excavator. The ministry said it was committed to expediting repairs to disaster-affected infrastructure through coordination and measures tailored to conditions on the ground.