Indonesian Political, Business & Finance News

Public Works Ministry Deploys Heavy Machinery to Clear Flood Debris in Subulussalam

| | Source: Republika Translated from Indonesian | Infrastructure
Public Works Ministry Deploys Heavy Machinery to Clear Flood Debris in Subulussalam
Image: Republika

BANDA ACEH — The Public Works Ministry, through the Sumatra I River Basin Agency (BWS Sumatera I), has deployed an excavator to support emergency flood response in Jabi-Jabi village, Sultan Daulat sub-district, Subulussalam, Aceh. The heavy machinery will help clear flood debris, supporting the recovery of the local environment and residents’ daily activities.

“The Public Works Ministry has mobilised all available resources, including heavy machinery, technical personnel and logistical support, to assist with disaster response,” Public Works Minister Dody Hanggodo said in a statement received in Banda Aceh on Sunday (14 November 2026).

Sixteen villages across three sub-districts in Subulussalam have again been hit by river flooding since Friday (13 November), following persistent heavy rain upstream that raised river levels and caused water to overflow into residential areas.

The flooding has also affected several public facilities, including schools, community health centres and roads. The clean-water supply infrastructure was also affected after the Jontor municipal water company’s intake structure was damaged when it gave way.

The Sumatra I River Basin Agency’s disaster task force and its Water Resources Operations and Maintenance Team 2 immediately monitored conditions in affected locations and coordinated with the Subulussalam Regional Disaster Management Agency (BPBD).

On 13 November 2026, an excavator was dispatched to Subulussalam to support the emergency response, particularly the removal of flood debris.

In a previous statement on disaster response in Sumatra, the Public Works Minister emphasised the importance of speed and collaboration in emergencies.

“In an emergency, speed and collaboration are key,” Minister Dody Hanggodo said.

In addition to the emergency response, the Public Works Ministry, through BWS Sumatera I, is preparing follow-up work to repair the Lae Suraya River embankment and normalise the river. These measures are intended to improve water flow and reduce the risk of further flooding in the affected area.

The ministry is continuing to coordinate with local government and relevant agencies to ensure that repairs to affected infrastructure meet needs on the ground.

The effort forms part of the ministry’s commitment to protecting public safety, restoring affected areas and strengthening water-resources infrastructure to reduce the risk of hydrometeorological disasters.

More from 15 November 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/public-works-ministry-deploys-heavy-machinery-to-clear-flood-debris-in-subulussalam-1794747044)
Originally published by Republika (https://daerah.republika.co.id/berita/tojll2370/kementerian-pu-kerahkan-alat-berat-bersihkan-material-banjir-di-subulussalam), translated from Indonesian
Print