Public Works Ministry Allocates Rp 21.4 Trillion to Restore Rivers and Roads Hit by Sumatra Disasters
The Ministry of Public Works has outlined progress on post-disaster infrastructure recovery in Aceh, North Sumatra and West Sumatra. It said an allocation of Rp 21.4 trillion had been set aside for recovery efforts in 2026.
“The effective 2026 budget for handling disasters in Sumatra at the Ministry of Public Works is Rp 21.42 trillion. This is divided among the water resources sector, with Rp 7.85 trillion; highways, with Rp 6.64 trillion; human settlements, with Rp 4.05 trillion; and strategic infrastructure, with Rp 2.89 trillion,” the ministry’s Secretary-General, Apri Artoto, said at the Home Affairs Ministry office on Wednesday (28 October 2026).
Apri said work was under way on 17 irrigation areas and 33 rivers in the affected regions. Recovery is being carried out in stages at the various sites.
“In the water resources sector, of the 25 irrigation areas, we are working on 17, with average progress of around 15%. In addition to irrigation, we are also handling 33 rivers under the central government’s authority. Average progress there is around 19.19%,” he said.
Apri said the ministry was focusing on work at river mouths to ensure the smooth flow of rivers.
“In addition to the rivers themselves, we are also carrying out work at river mouths. This is one of our main priorities because river mouths are control points that determine the stability of flows from upstream to downstream. Of the 29 river-mouth projects planned, four have been completed and work is under way on six, with average progress of around 14.94%,” he said.
Apri said the Directorate General of Highways had completed repairs on two of the 33 road sections. Work was also under way on 15 of the 20 bridges planned for repair.
“In the highways sector, we are handling 33 national road sections in total. Two have been completed, while work on the remainder is under way, with average progress of 59.04%. As for bridges, 20 are planned for repair. Five have been completed — three in Aceh and two in West Sumatra — while work on the other 15 is in progress and has reached an average of 63.29%,” he said.
Home Affairs Minister Tito Karnavian said river normalisation should be made a priority. Heavy rainfall in the affected areas could lead to flooding, he said.
“This is also a request from local government leaders: that priority be given to normalising rivers that are vulnerable because sediment levels are already high, which can cause flooding during heavy rain. The rivers cannot contain the water because of the sediment, and it eventually overflows, as happened in Padang City, Southeast Aceh, Tukan district in Central Tapanuli, and Aceh Tamiang. Most recently, this also happened in Solok Regency,” Tito said.
Source: jawawa.id (https://jawawa.id/newsitem/public-works-ministry-allocates-rp-21-4-trillion-to-restore-rivers-and-roads-hit-by-sumatra-disasters-1793184918)
Originally published by detikcom (https://news.detik.com/berita/d-8728166/pu-gelontorkan-rp-21-4-t-pulihkan-sungai-jalan-terdampak-bencana-sumatera), translated from Indonesian