Public Works Minister instructs acceleration of 'sabo dam' preparation in Solok
The Minister of Public Works (PU), Dody Hasting, has instructed the acceleration of the construction of lava flow barriers, known as sabo dams, in the upstream areas of the rivers affected by flash floods in Solok Regency, West Sumatra.
“I have instructed the Director General of Water Resources to accelerate the construction of the sabo dam. The technical team from the sabo office is already on-site,” said Minister Dody Hanggodo during an inspection of the disaster impact management site in Solok Regency on Tuesday night.
The Minister noted that this acceleration is crucial given that moderate to heavy rainfall is still occurring in the area, particularly over the next few days.
In the upstream area of the Batang Baliang River, piles of debris from the flash floods, including wood, rocks, and mud, remain and could descend at any time. Therefore, he stated, the presence of sabo dams and check dams at upstream points serves as an effective primary barrier to prevent solid materials from directly hitting residential areas downstream.
“Our priority is to ensure that if heavy rain falls again upstream, the wood and mud materials can be quickly contained by the sabo dam,” he said.
He added that experiences from other regions serve as an evaluation for his ministry to accelerate works and immediately place structures at safe points, implemented in stages. He has also instructed the addition of heavy equipment and supporting construction materials as the technical designs for the sabo dams are finalised.
This accelerated infrastructure response is a follow-up to the directives from President Prabowo Subianto, ensuring that post-disaster management is swift and responsive to restore the conditions of affected communities.
In addition to focusing on flood-prevention infrastructure, the Ministry of Public Works is also ensuring the availability of clean water supplies for evacuees and affected residents.
“The clean water needs for residents and evacuees are being continuously supplied and ensured to be safe,” he said. His department has also begun phased repairs on two kilometres of the drinking water supply system (SPAM) that was damaged by the natural disaster on Monday night.
Source: jawawa.id (https://jawawa.id/newsitem/public-works-minister-instructs-acceleration-of-sabo-dam-preparation-in-solok-1790697548)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5763961/menteri-pu-instruksikan-percepatan-penyiapan-sabo-dam-di-solok), translated from Indonesian