Indonesian Political, Business & Finance News

Public Works Minister Deploys Pumps and Excavators to Tackle Flooding in Padang

| Source: VIVA.co.id Translated from Indonesian | Infrastructure
Public Works Minister Deploys Pumps and Excavators to Tackle Flooding in Padang
Image: VIVA.co.id

The Public Works Ministry, through the West Sumatra V River Basin Authority in Padang, is responding to flooding caused by the overflowing Batang Air Dingin River in Padang, West Sumatra, on Saturday (10 October 2026).

Heavy rain across the area caused a significant increase in river flows, resulting in an embankment breach and flooding in residential neighbourhoods.

The flooding affected around 200 homes in Lubuk Minturun Sub-district, Koto Tangah District, and Ulak Karang Utara Sub-district, Padang Utara District. Preliminary reports indicate that there were no fatalities. Floodwater remains in several affected locations.

Data from the Air Dingin River Basin rainfall monitoring post recorded 112 millimetres of rain over six hours. Heavy rain fell from about 12.00 to 14.30 Western Indonesian Time, increasing the flow of the Batang Air Dingin River and causing damage to the embankment.

Public Works Minister Dody Hanggodo said the ministry was continuing to strengthen its response to hydrometeorological disasters, both through emergency measures and preparations for permanent works to reduce the risk of recurrent flooding.

“Flood response must be swift and measured, particularly to protect public safety and minimise the impact on residential areas. Alongside emergency measures, we are preparing permanent works to reduce the risk of similar incidents,” Dody said.

As part of the emergency response, the West Sumatra V River Basin Authority is monitoring conditions on the ground, coordinating with relevant agencies, and collecting and documenting information on the causes and impacts of the flooding.

The authority has also deployed one mobile flood pump to Ulak Karang Utara and mobilised and operated one crawler excavator in Lubuk Minturun to help deal with the floodwater.

In addition to the emergency response, the Public Works Ministry has included permanent works for the Batang Air Dingin River in its 2026 master plan. These works will include a check dam to control sediment, embankment construction and river normalisation.

The permanent measures are expected to improve river-flow control, strengthen protection for residential areas and reduce the risk of repeated flooding during periods of heavy rain.

Tags: berita

More from 12 October 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/public-works-minister-deploys-pumps-and-excavators-to-tackle-flooding-in-padang-1791802308)
Originally published by VIVA.co.id (https://www.viva.co.id/berita/nasional/1935176-menteri-pu-kerahkan-pompa-dan-ekskavator-tangani-banjir-kota-padang), translated from Indonesian
Print