Indonesian Political, Business & Finance News

PT KAI to Integrate Karet and BNI City Stations, Constructing Air-Conditioned Travelator within 70 Days

| | Source: Media Indonesia Translated from Indonesian | Infrastructure
PT KAI to Integrate Karet and BNI City Stations, Constructing Air-Conditioned Travelator within 70 Days
Image: Media Indonesia

PT Kereta Api Indonesia (Persero), known as PT KAI, has officially commenced an integration project between Karet Station and Sudirman Baru/BNI City Station. As part of this improvement initiative, PT KAI plans to construct an automated moving walkway (travelator) equipped with air-conditioning to connect the two stations.

The integration work is being managed by KAI Daop 1 Jakarta alongside KAI Commuter and is scheduled to run from 1 September until 31 December 2026. This step is part of an effort to enhance Jabodetabek Commuter Line services by reorganising passenger flows, strengthening operational safety, and improving access around the station areas.

The President Director of PT KAI, Bobby Rasyundin, confirmed that the preparations for these supporting facilities will be fast-tracked. “It is fully committed. The construction of the travelator will begin within 70 days from tomorrow,” Bobby stated in Jakarta on Monday.

He added that the integration plan is being prepared with a principle of caution, as Karet Station is an integral part of the daily activities of many passengers and the local community. Similar sentiments were expressed by the Minister of Transportation, Dudy Purwagandhi, who hopes the travelator construction will be completed according to KAI’s target to increase the comfort of public transport users.

During the integration process, the boarding and alighting services for Commuter Line users, which were previously conducted at Karet Station, will be fully diverted to Sudirman Baru/BNI City Station. The President Director of KAI Commuter, Purnomo Sidi, explained that this measure was taken to ensure passenger journeys remain safe and comfortable, noting that Karet Station is a vital hub for the surrounding community.

Regarding passenger movement, Commuter Line users who previously used Karet Station will instead use the walkway access beside Karet Station leading to BNI City Station. Supporting facilities, such as electronic gates, ticket counters, and halls on the western side of BNI City Station, are already installed and ready to connect directly with the access from the Karet side.

Under the final structural scheme, the Karet Station area will be repurposed as a concourse or connecting space leading to BNI City Station. The air-conditioned travelator is intended to make the transition more comfortable for passengers. All gate-in and gate-out activities will eventually be centralised at BNI City Station, while the Karet area will function as a well-organised supporting access point.

Despite the changes to access, train operations are guaranteed not to be disrupted. Currently, there are 264 Commuter Line trips serving the Kampung Bandan/Cikarang route via Karet and BNI City Stations. The Cikarang Commuter Line schedule remains unchanged; only the boarding and alighting location at Karet Station has moved to BNI City Station. Meanwhile, the Soekarno-Hatta Airport Rail Link service at BNI City Station continues to operate normally.

More from 1 September 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/pt-kai-to-integrate-karet-and-bni-city-stations-constructing-air-conditioned-travelator-within-70-days-1788238326)
Originally published by Media Indonesia (https://mediaindonesia.com/megapolitan/928255/pt-kai-integrasikan-stasiun-karet-dan-bni-city-bangun-travelator-ber-ac-70-hari), translated from Indonesian
Print