PT GWS Sidoarjo Reveals Chronology of Fatal Explosion Killing One Person
Management of PT Great Wall Steel (GWS) has finally spoken out regarding the explosion incident that occurred at the steel smelting factory site in Sidoarjo, East Java, on Monday (6/4) afternoon approaching evening. At least one victim died and two people suffered minor injuries as a result of the incident. HRD & General Affairs of PT GWS, Heri Prasetyo, confirmed that the explosion began when workers were cutting scrap metal from a supplier in the open area or scrap yard. The scrap metal had to undergo a cutting process because its dimensions were too large to enter the smelting machine. However, unexpectedly, the material being cut exploded. “Well, when it was being cut, they didn’t know and suspect that what they were cutting exploded,” said Heri during clarification in Sidoarjo on Monday night. Heri stated that the company has not yet been able to confirm the identity of the supplier sending the material due to the many suppliers entering the company. As a result of the explosion, two workers who were cutting the scrap were reported to have survived and suffered minor injuries. However, a truck assistant was declared dead. The truck assistant victim was resting near the vehicle when iron shards flew and hit his body parts. Heri estimated the distance of the victim from the explosion centre to be more than 50 metres. “The third victim is the assistant, yes. So the assistant’s position was approximately more than 50 metres from the incident location, unexpectedly he was hit by the shards from the cylinder or iron that was being cut earlier. Actually, the position was quite far and obstructed by about three to four trucks,” said Heri. Heri claimed that based on initial examinations by the Gegana team and Inafis of the National Police, no indications were found of military explosives or bombs. This is reinforced by the fact that there was no damage to buildings or factory equipment around the location, apart from the ground condition being damaged at the explosion centre point. “The police side conveyed that if it were from a military bomb, there would be damage around it. But clearly around us, there is no damage at all to either buildings or equipment around the incident,” said Heri. “But this is still undergoing laboratory processes to find out what caused it to explode,” he added. Meanwhile, the East Java Regional Police deployed a bomb disposal team (Jibom) from the Brimob Gegana Detachment to the scene of the explosion at the PT Great Wall Steel (GWS) steel processing factory. This step was taken to carry out sterilisation and crime scene processing following the explosion incident that killed one worker. Sidoarjo Police Chief Commissioner Pol Christian Tobing confirmed that the deployment of this explosives expert team was to comb the area and ensure the exact cause of the loud bang. “Members of the Police Resort and Police Sector, as well as the Jibom Gegana team, are at the location still processing the crime scene while we determine the cause of the explosion sound,” said Christian. The fatal explosion at the PT GWS steel processing factory impacted surrounding residential areas in Janti Village. In addition, it was reported to have spread to Surabaya City on Monday (6/4). At least two houses in the Kutisari Indah Barat area suffered material damage as a result of the incident.
Source: jawawa.id (https://jawawa.id/newsitem/pt-gws-sidoarjo-reveals-chronology-of-fatal-explosion-killing-one-person-1775620385)
Originally published by CNN Indonesia (https://www.cnnindonesia.com/nasional/20260406204404-20-1344897/pt-gws-sidoarjo-ungkap-kronologi-ledakan-maut-tewaskan-satu-orang), translated from Indonesian