Indonesian Political, Business & Finance News

Presidential Staff Office Backs Resolution of Licensing Hurdles for Strategic Oil and Gas Projects in East Java

| Source: Antara (Indonesian) Translated from Indonesian | Energy
Presidential Staff Office Backs Resolution of Licensing Hurdles for Strategic Oil and Gas Projects in East Java
Image: Antara (Indonesian)

Presidential Chief of Staff General (Ret.) Dudung Abdurachman has conducted field inspections in Bojonegoro Regency, East Java, as part of efforts to resolve licensing obstacles for three strategic national oil and gas projects. The visit aimed to accelerate the settlement of regulatory hurdles related to Protected Rice Fields (LSD) and Sustainable Food Agricultural Land (LP2B) designations that have been holding up the developments.

Speaking after a cross-sectoral coordination meeting in Bojonegoro on Tuesday, Dudung stressed that the government must safeguard domestic oil and gas production without creating a conflict between food and energy self-sufficiency. He noted that both are key agendas under President Prabowo Subianto’s Astacita vision and must progress in tandem. ‘Agricultural land must be protected, but national energy needs must also be met to achieve the target of 1 million barrels of oil production per year by 2029,’ he stated.

The meeting followed Dudung’s inspection of the Kedung Keris Wellpad in Kalitidu District, a crucial upstream oil and gas site, and the ExxonMobil Cepu Limited (EMCL) Central Processing Facility. Discussions focused on three priority projects: the Kedung Keris West project by EMCL in Bojonegoro, the Banyugeni-001 exploration well by PT Pertamina EP in Bojonegoro, and the RBG Block I gas field by TIS Petroleum E&P Blora Ltd. in Grobogan and Demak regencies, Central Java.

A major sticking point has been the macro-level land status regulations, particularly in Demak Regency where 90 percent of the area is designated as LP2B. Dudung highlighted that existing rules require a minimum threshold of 87 percent Raw Rice Land to be maintained before any conversion can occur. To address concerns over land-use overlap, Head of the Upstream Oil and Gas Regulatory Task Force (SKK Migas) Djoko Siswanto confirmed a regulatory solution is in place. He explained that for every hectare of LSD converted for oil and gas production, the operator is obligated to provide three hectares of replacement land, ensuring agricultural capacity is not diminished.

The land requirements for the upstream projects are relatively small compared to their economic impact. The Kedung Keris West project requires approximately 0.6 hectares, the Banyugeni well needs 3.5 hectares, and the Grobogan project requires 4.4 hectares. Following the coordination meeting, the KSP confirmed that data synchronisation processes between the Ministry of Agrarian Affairs and Spatial Planning and the Ministry of Agriculture have been completed and are running in parallel. Local leaders, including the Regent of Demak and the Deputy Regents of Bojonegoro and Grobogan, have pledged their full support for the continuation of the energy projects.

More from 7 July 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/presidential-staff-office-backs-resolution-of-licensing-hurdles-for-strategic-oil-and-gas-projects-in-east-1783425377)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5639117/ksp-dukung-penuntasan-isu-perizinan-proyek-migas-strategis-di-jatim), translated from Indonesian
Print