Pluit Reservoir Temporarily Turns Green as Water Hyacinth Grows Rapidly in Four Days
JAKARTA — Water hyacinth has been reported to grow rapidly and temporarily covered parts of the surface of Pluit Reservoir in Penjaringan, North Jakarta, within just four days. This phenomenon has raised concerns as it disrupts the water body’s condition and reservoir cleaning activities. Officers from the Water Body Waste Handling Unit of the Jakarta Environmental Agency are now conducting intensive transportation to control the spread of the plant. “This water hyacinth appeared about four days ago due to unpredictable weather. Rain and intense heat caused the water hyacinth to grow quickly,” said Abu Bakar when met at Pluit Reservoir on Wednesday (1/4/2026). He explained that the growth of water hyacinth became visible after Eid and continued to accumulate at several points in the reservoir. “It started right after fasting ended. It’s piling up more here,” he said. Several points in the reservoir, especially at the corner near the Pluit subsector police post and around the waste filter, were once crowded with water hyacinth. Officers began transporting the water hyacinth gradually since Tuesday (31/3/2026). In one day, as many as 12 trucks of water hyacinth were successfully transported. “Yes, until yesterday we transported from morning until evening. Around 5:00 p.m. WIB, almost 6:00 p.m. WIB, we finished. We transported about 12 vehicles,” said Abu Bakar. With a capacity of about nine cubic metres per truck, the total water hyacinth transported reached approximately 108 cubic metres in a day. “Now it’s already six small vehicles. Each vehicle has a capacity of nine cubic metres,” he explained. In addition to transportation, water hyacinth control is also carried out through partitioning methods using high-density polyethylene (HDPE) material and processing into compost. Cleaning involves pulling machines in the waste filter area and heavy equipment at several points in the reservoir.
Source: jawawa.id (https://jawawa.id/newsitem/pluit-reservoir-temporarily-turns-green-as-water-hyacinth-grows-rapidly-in-four-days-1775026259)
Originally published by Kompas (https://megapolitan.kompas.com/read/2026/04/01/13154261/waduk-pluit-sempat-menghijau-eceng-gondok-tumbuh-pesat-dalam-4-hari?utm_source=ABC&utm_medium=rss), translated from Indonesian