PLN Ready to Absorb Electricity from Legok Nangka Waste-to-Energy Plant, Supporting Sustainable Waste Management in West Java
Bandung (ANTARA) - PT PLN (Persero) continues to strengthen its commitment to supporting the government’s sustainable waste management programme through the purchase of electricity generated from the Legok Nangka Waste-to-Energy (PSEL) facility in Bandung Regency, West Java. The PSEL project, which has now entered the construction phase, is targeted to begin operations in 2029 and is capable of processing up to 2,131 tonnes of waste per day, generating an electricity capacity of 40.79 megawatts (MW) or reaching 310 gigawatt-hours (GWh) per year.
As part of the support for the project’s development, PLN signed a Power Purchase Agreement (PJB) in March 2026 with PT Jabar Environmental Solutions (PT JES), the project implementing business entity appointed by the West Java Provincial Government. Through this agreement, the electricity produced by the Legok Nangka PSEL will be distributed into PLN’s electricity system for public use.
The Deputy Minister of Energy and Mineral Resources (ESDM), Yuliot, stated that the Legok Nangka PSEL is part of the government’s efforts to accelerate urban waste handling while developing its use as energy (waste-to-energy). This project also aligns with the directives of President Prabowo Subiability to resolve waste issues before 2029 through upstream-to-downstream management within the 2025–2029 National Medium-Term Development Plan (RPJMN).
“Today’s groundbreaking is not merely marking the start of infrastructure construction, but also serves as a symbol of our shared commitment to realising a cleaner, greener, and more sustainable future for Indonesia,” said Yuliot during the Legok Nangka PSEL groundbreaking ceremony in Bandung, West Java, on Wednesday (29/7).
He expressed hope that the Legok Nangka PSEL could serve as a model for waste-to-energy project development that can be applied in various regions, providing benefits to both the environment and the community. “With significant generation capacity and investment support, this project is expected to provide tangible benefits through waste volume reduction, the provision of clean energy, job creation, increased regional economic activity, emission reduction, and the improvement of environmental quality and public health,” Yuliot added.
Echoing this sentiment, the Governor of West Java, Dedi Mulyadi, stated that the Legok Nangka PSEL is a long-term solution to address waste issues in the Greater Bandung area while providing economic and environmental benefits by utilising waste as an energy source. According to him, this project and other PSEL facilities in the region will be important milestones in achieving more sustainable waste management in West Java.
“This will serve as a catalyst for building a modern waste management system, while also educating the public on orderliness and cleanliness, ultimately improving air and environmental quality,” said Dedi.
Dedi also noted that beyond being a waste management solution, the project will strengthen the clean energy supply required to support industrial growth and investment in West Java. “The second blessing is that we will obtain electrical energy that contributes to PLN’s capacity to provide significant energy for industrial life,” he said.
Meanwhile, PLN’s Director of Project Management and New Renewable Energy, Suroso Isnandar, stated that the company is ready to execute government directives in supporting the PSEL, specifically the Legok Nangka facility, as a concrete solution to the waste emergency and a step towards energy self-sufficiency. The agreed 20-year PJB period represents PLN’s commitment to the sustainability of the Legok Nangka PSEL. Through this agreement, PLN provides certainty in the purchase of the electricity produced, thereby supporting the sustainable development of waste-to-energy projects.
“PLN is ready to execute the PJB in accordance with government directives. We will absorb the electricity production generated from this waste processing and distribute it to the community. Through the 20-year PJB, we are providing the certainty required for this project to operate sustainably,” said Suroso.
Suroso added that, in addition to strengthening the clean energy mix, the development of the Legok Nangka PSEL demonstrates that the electricity sector can contribute to solving environmental issues through the utilisation of waste as energy. “Through PSEL, we are not only preserving the environment for the future, but also generating electricity that benefits the community. This is renewable energy that, in a continuous cycle, will persist as long as there is waste, resulting in electricity that can be utilised,” he concluded.
Source: jawawa.id (https://jawawa.id/newsitem/pln-ready-to-absorb-electricity-from-legok-nangka-waste-to-energy-plant-supporting-sustainable-waste-1785470413)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5673809/pln-siap-serap-listrik-psel-legok-nangka-dukung-pengelolaan-sampah-berkelanjutan-di-jawa-barat), translated from Indonesian