Indonesian Political, Business & Finance News

PLN prepares electric vehicle battery swapping infrastructure in Klungkung

| Source: Antara (Indonesian) Translated from Indonesian | Energy
PLN prepares electric vehicle battery swapping infrastructure in Klungkung
Image: Antara (Indonesian)

PT PLN (Persero) Bali Distribution Unit (UID), alongside several partners, is preparing the infrastructure for a Battery Swap System to support the development of electric vehicles in Klungkung Regency, Bali.

General Manager of PLN UID Bali, Ajrun Karim, stated in Klungkung on Thursday that PLN is supporting the electrical requirements and power connections necessary for the installation and operation of a battery swapping pilot project, which will be established at five locations in Klungkung.

“Through the scope of this cooperation, PLN UID Bali is fully committed to providing the best support, particularly regarding electrical needs and required power connections. This infrastructure will support the installation and operation of the Battery Swap System pilot project at five strategic locations in Klungting Regency,” said Ajrun following the signing of a Memorandum of Understanding between PLN UID Bali, PT INAKO Kreta Udhaya, the Korea Smart e-Mobility Association (KEMA), and the Korea Automotive Technology Institute (KATECH) at the Wyndham Tamansari Jivva Resort, Klungkung.

The electrical support on the ground will be implemented by PLN UP3 Bali Timur through the Klungkung ULP.

PLN will provide electrical services according to power requirements and applicable regulations, while INAKO, KEMA, and KATECH will manage licensing and power connection requirements.

The pilot project is scheduled to commence in October 2026, featuring the operation of five electric three-wheelers for specialised functions. These electric vehicles will be utilised for various purposes, including waste collection, refrigerated transport, and goods delivery. Additionally, small-scale electric three-wheelers and four-wheelers for agricultural transport and spraying are being developed.

Further expansion is planned for 2027, with the goal of deploying more than 30 electric vehicles across Bali.

Meanwhile, the Regent of Klungkung, I Made Satria, noted that the development of electric vehicles aligns with the local government’s efforts to realise Nusa Penida as a ‘green island’ by 2030.

“If it becomes a green island, Nusa Penida will become a more high-class tourist destination. We are preparing this gradually until it can be fully achieved in 2030,” said Satria.

He added that the development of the electric vehicle ecosystem is also expected to support sustainable tourism while creating new business opportunities for the local community.

The collaboration encompasses not only infrastructure provision but also the testing of the suitability and quality of the battery swapping system in the field. The parties will also utilise usage data and system monitoring as part of technological development.

The parties will subsequently follow up on this cooperation through formal Cooperation Agreements as required.

This collaboration serves as the initial stage in developing an integrated electric mobility ecosystem in Klungkung. Ajrun expressed hope that support in electrical infrastructure, technology, and cross-border cooperation could expand the use of electric vehicles, supporting eco-friendly transport and the development of a green economy in Bali.

More from 1 October 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/pln-prepares-electric-vehicle-battery-swapping-infrastructure-in-klungkung-1790827240)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5765912/pln-siapkan-infrastruktur-tukar-baterai-kendaraan-listrik-di-klungkung), translated from Indonesian
Print