PHR Zone 4 Records Oil Production of 5,605 BOPD from GNK-114 Well
Palembang (ANTARA) - Pertamina Hulu Rokan (PHR) Zone 4 has recorded a potential oil production of 5,605.68 barrels of oil per day (BOPD) from the GNK-114 well, located in the Gunung Kemala Structure, Prabumulih, South Sumatra.
General Manager of PHR Zone 4, Heru Iriost, stated in a written statement received in Palembang on Thursday that this production potential was identified based on initial flow test results conducted on 27-28 September 2026.
In addition to oil, the well also shows a potential gas production of 2.96 million standard cubic feet per day (MMSCFD) under open flow conditions.
“The combination of batch drilling and dual commingle completion in the development of the GNK-114 well is part of our commitment to continuously achieving targets by introducing innovation into upstream oil and gas operations,” he said.
According to him, this innovation is part of the company’s efforts to provide energy efficiently, effectively, and reliably, while maintaining safety as the primary factor in every task.
Batch drilling is a well-drilling technique using a rig that can move between wells in a single location without the need to dismantle and reinstall all equipment. This technique allows for the simultaneous drilling of several nearby wells, enabling the drilling process to proceed more quickly and efficiently.
PHR Zone 4 began implementing batch drilling in the Pertamina EP Prabumulih Field working area in 2026. The GNK-114 well was drilled alongside four other nearby wells, namely GNK-PD66, GNK-PD65, GNK-PD68, and GNK-PD79.
Specifically for the GNK-114 well, the application of batch drilling was combined with dual completion. This method allows a single well to produce from two reservoir layers simultaneously.
Through dual completion, the GNK-114 well can produce from the TAF-K1 layer as well as the TAF C series layer, which consists of TAF-C1 and TAF-C2, through one well.
Meanwhile, the Manager of Subsurface and Development Area 2 for PHR Zone 4, Chandra Mustofa Eka, stated that GNK-114 serves as a pilot well for the implementation of batch drilling and dual completion in Gunung Kemala, following directives from SKK Migas.
His team will evaluate the results of this technological application and study the opportunities to replicate similar methods in other wells.
The achievement of the GNK-114 well also supports PHR Zone 4’s 2026 production targets, which are set at 30,305 BOPD for oil and 485.07 MMSCFD for gas.
Source: jawawa.id (https://jawawa.id/newsitem/phr-zone-4-records-oil-production-of-5-605-bopd-from-gnk-114-well-1790863076)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5767153/phr-zona-4-catat-produksi-minyak-5605-bopd-dari-sumur-gnk-114), translated from Indonesian