Pertamina Patra Niaga Brings in 45.9 Thousand Metric Tonnes of LPG Aboard Pertamina Gas 1
PT Pertamina Patra Niaga has once again strengthened national energy security with the arrival of the Pertamina Gas 1 (PG1) fleet, carrying around 45,900 metric tonnes of Liquefied Petroleum Gas (LPG) from Freeport, Texas, United States. The supply forms part of the company’s strategy to maintain the reliability of national LPG supply in order to meet the needs of the public and the productive sector, while reinforcing energy resilience amid the dynamics of the global energy market.
The cargo carried by Pertamina Gas 1 consists of approximately 23,000 metric tonnes of propane and 22,800 metric tonnes of butane. Procuring supplies from various global sources is part of Pertamina Patra Niaga’s efforts to ensure national LPG availability through an integrated supply chain, spanning procurement, transportation, storage and distribution.
VP Corporate Communication of PT Pertamina Patra Niaga, Kitty Andhora, said that energy security is a vital foundation in supporting people’s activities as well as national economic growth. For this reason, Pertamina Patra Niaga continues to strengthen the reliability of the energy supply chain through diversification of supply sources, optimisation of logistics infrastructure, and timely, sustainable distribution.
“Amid global energy dynamics, maintaining supply reliability is an important part of strengthening national energy security. Pertamina Patra Niaga continues to ensure that every link in the supply chain, from procurement to distribution, operates in an integrated manner so that the energy needs of the public and the productive sector continue to be met. The arrival of Pertamina Gas 1 is tangible proof of our commitment to ensuring that LPG supply remains available safely, reliably and sustainably,” said Kitty.
The LPG cargo carried by Pertamina Gas 1 is equivalent to around 15.2 million 3-kilogram LPG canisters. Upon arrival in Indonesia, some 26,000 metric tonnes will be unloaded at the Sekong LPG Terminal in Banten, and around 19,900 metric tonnes will be unloaded at the Arun LPG Terminal in Aceh. The supply will subsequently bolster national stocks before being distributed through Pertamina Patra Niaga’s infrastructure network according to need, in order to maintain reliable LPG supply for the public.
Pertamina Gas 1 departed from Freeport (US FPO), Texas, United States, on 29 May 2026 and undertook a transoceanic voyage to Indonesia with a strong emphasis on safety, security and operational reliability. This delivery reflects Pertamina Patra Niaga’s capability in managing the global energy supply chain professionally, so that LPG supplies can arrive on schedule to support the fulfilment of national energy needs.
As the Downstream Subholding, Pertamina Patra Niaga will continue to strengthen the energy logistics system through optimisation of procurement, transport fleets, terminal infrastructure and an integrated distribution network. These efforts form part of the company’s commitment to safeguarding national energy security whilst ensuring the availability of safe, reliable and sustainable energy for the public.
Source: jawawa.id (https://jawawa.id/newsitem/pertamina-patra-niaga-brings-in-45-9-thousand-metric-tonnes-of-lpg-aboard-pertamina-gas-1-1783943603)
Originally published by Republika (https://ekonomi.republika.co.id/berita/ti420j522/pertamina-patra-niaga-datangkan-pertamina-gas-1-bawa-459-ribu-metrik-ton-lpg), translated from Indonesian