Pertamina EP to Invest $100m in Enhanced Oil Recovery Strategy
JG & ID by Retno Ayuningtyas
Pertamina EP, the exploration unit of state-owned energy company Pertamina, has set aside $100 million for its enhanced oil recovery program on aging wells so that it can extract as much as an additional 30,000 barrels per day.
EOR is an expensive technique of boosting crude oil production from an old oilfield, which includes the injection of water or chemicals before drilling deeper.
Doddy Priambodo, director for exploration and development at Pertamina EP, told Investor Daily on Sunday that the company expected a gradual increase in oil production before it reaches the maximum level of 30,000 bpd. This year, additional production from the EOR program is expected at 3,250 bpd.
Pertamina EP will apply the water-injection technique to boost production at its fields Rantau, Kenali Asam, Tempino, Talang Jimar, Tanjung Tiga Barat and Tapian Timur. Doddy said that the company will use chemical injections in another field near Tanjung Tiga Barat.
Pertamina EP is also conducting studies at 36 other fields that could also be candidates for the EOR program.
EOR techniques are not instant, and it could take awhile for production to increase substantially, the director said.
“The result cannot be visible instantly, it may take a few years,” Doddy said. He did not elaborate further.
Rudi Rubiandini, the head of upstream oil and gas regulator SKMigas, echoed Doddy’s comment that EOR activities cannot instantly yield results.
“In my calculation, a significant additional production from EOR would only be visible after 2017,” he said.
Rudi said, however, most oil reserves in Indonesia that have not been depleted by contractors are located in Pertamina EP’s working production zone.
He referred to SKMigas data that showed 70 percent of Pertamina EP’s oil fields have not been touched by the EOR technique.
Rudi said current Pertamina EP production is at 150,000 bpd. With a more intensified EOR strategy implemented, the company could hit 200,000 bpd in 2023.
Efforts to boost oil production are crucial as SKMigas has estimated the country’s oil producers may fail to meet a targeted production of 900,000 bpd set by the state budget this year.
However, Rudi said in January that current oil production stands at about 830,000 bpd, and the full-year levels could range at 850,000 to 900,000 bpd.
Indonesia’s oil production hit its peak during the primary and secondary recovery periods of 1977 to 1995, with production hitting as high as around 1.6 million bpd.
Production fell to 1 million bpd in 2003 and the continued gradual decline due to aging fields and lack of investment eventually led the country to leave the Organization of the Petroleum Exporting Countries in 2008.
Source: jawawa.id (https://jawawa.id/newsitem/pertamina-ep-to-invest-100m-in-enhanced-oil-recovery-strategy-1360688400)
Originally published by Investor Daily & JG (http://www.thejakartaglobe.com/business/pertamina-ep-to-invest-100m-in-enhanced-oil-recovery-strategy/571021)