Pani Gold Mine Drilled to 3,600 Metres, Potential of 7 Million Ounces of Gold
Jakarta, CNBC Indonesia - PT Merdeka Gold Resources Tbk (EMAS), a subsidiary of PT Merdeka Copper Gold Tbk, has commenced a diamond deep drilling programme to 3,600 metres at the Pani Gold Mine. The exploration programme has the potential to increase mineral resources currently estimated at around 7 million ounces of gold.
The Pani Gold Mine is located in Marisa District, Pohuwato Regency, Gorontalo Province. It currently has an estimated mineral resource of 291.5 million tonnes with an average gold grade of 0.75 grams per tonne (g/t), equivalent to approximately 7 million ounces of gold. This resource base forms the foundation for developing a large-scale, long-life gold mining operation.
The mineral resource estimate derives from a 135-hectare exploration area, part of the company’s 14,670-hectare concession.
Previous exploration indicated mineralisation beyond the limits of prior drilling programmes. The 3,600-metre diamond drilling programme is designed to assess the potential to expand the existing resource base.
Merdeka Gold Resources President Director Boyke Abidin explained that the new drilling programme will test the continuity of gold mineralisation at greater depths. The initial phase includes six drill holes, with one rig operational and a second scheduled to start next month.
He added that if initial results show positive potential, the company plans to expand the drilling programme further.
“Alongside the commencement of production at Pani, the company is now in a stronger position to continue testing mineralisation potential at deeper areas through six meticulously designed drill points. The programme also has flexibility to be expanded further if drilling results indicate positive potential,” Abidin stated in a written release on Friday, 29 May 2026.
At Kolokoa, the company has completed an initial drilling programme previously announced, with 54 drill holes totalling 11,701.6 metres. Within six months and at a cost of approximately USD 2.4 million, the company has set exploration targets for Kolokoa at 20 million to 40 million tonnes with gold grades of 0.3 g/t to 0.5 g/t, indicating additional resource potential. The company is currently preparing its maiden mineral resource estimate, targeted for release in Q2 2026.
Additionally, broader exploration programmes will include drilling at Lone Pine in H2 2026 and geophysical surveys using Mobile Magnetotelluric and helicopter-borne magnetic methods, planned for June or July 2026. Further information and data will be provided once drilling results are available and reviewed in accordance with applicable reporting standards, including JORC Code 2012 and KCMI 2017.
Source: jawawa.id (https://jawawa.id/newsitem/pani-gold-mine-drilled-to-3-600-metres-potential-of-7-million-ounces-of-gold-1780073410)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260529131119-4-738742/tambang-emas-pani-dibor-hingga-3600-meter-potensi-emasnya-7-juta-ons), translated from Indonesian