Indonesian Political, Business & Finance News

PAM JAYA Confirms Jatiluhur Reservoir Raw Water Supply Secure Until End of 2026

| Source: detikcom Translated from Indonesian | Infrastructure
PAM JAYA Confirms Jatiluhur Reservoir Raw Water Supply Secure Until End of 2026
Image: detikcom

The President Director of PAM JAYA, Arief Nasrudin, along with his management team, conducted a working visit to the Jatiluhur Reservoir in Purwakarta Regency, West Java. The inspection was carried out to ensure the availability and security of the raw water supply for Jakarta residents amidst the pressures of the dry season.

During the visit, the PAM JAYA delegation was received and accompanied by the management of the Jatiluhur Reservoir from Perum Jasa Tirta II (PJT II), including Business Director Didik Permadi Yoffana and Regional General Manager IV Anom Soal Herudjito.

Arief stated that the purpose of the visit was to ensure that the raw water supply from the Jatiluhur Reservoir remains secure while monitoring the mitigation steps prepared by the reservoir managers. Currently, the reservoir’s water level stands at 96.34 metres above sea level (masl), which is a decrease from normal levels but remains well above the lower operational limit of 87.5 masl.

“We want to ensure that the raw water supply from Jatiluhur is in a safe condition, although we remain vigilant because the current decrease in water level is at 96.3 masl. Fortunately, we have been assured by the PJT II management that various mitigation steps have been implemented to maintain a water volume that is still safe to supply to Jakarta,” Arief said in a written statement on Monday (31/8/2026).

Meanwhile, Didik explained that the current water conditions are still within safe limits to meet the needs for raw water, irrigation, and industrial requirements until the end of 2026. Anom added that the capacity calculations until 31 December 2026 show:

Storage water reserves: ±3.6 billion cubic metres

Estimated Citarum River flow: ±1.97 billion cubic metres

Local water sources: ±374 million cubic metres

Surplus requirement: ±976 million cubic metres

Consequently, the raw water reserves for supply to Jakarta until the end of the year are considered secure. Nevertheless, PAM JAYA and PJT II have agreed to increase vigilance and monitor developments in water levels periodically.

PAM JAYA relies on the Jatiluhur Reservoir as its primary raw water source, serving the clean water needs of the majority of Jakarta’s residents. The direct inspection of the upstream water source is part of the efforts to manage risks and ensure the sustainability of clean water services amidst weather changes and the dry season.

More from 31 August 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/pam-jaya-confirms-jatiluhur-reservoir-raw-water-supply-secure-until-end-of-2026-1788188413)
Originally published by detikcom (https://news.detik.com/berita/d-8642532/pam-jaya-pastikan-pasokan-air-baku-waduk-jatiluhur-aman-hingga-akhir-2026), translated from Indonesian
Print