Indonesian Political, Business & Finance News

Oil Production Test in Prabumulih Surges 192%, Yielding 288 Barrels

| Source: CNBC Indonesia Translated from Indonesian | Energy
Oil Production Test in Prabumulih Surges 192%, Yielding 288 Barrels
Image: CNBC Indonesia

Jakarta, CNBC Indonesia – The Special Task Force for Upstream Oil and Gas Business Activities (SKK Migas) reported that PT Pertamina EP Asset 2 (PT PHR Zone 4) began drilling development well BNG-089 at the BNG-A12 site in Prabumulih, South Sumatra, on 15 September 2026.

By 30 September 2026, production testing had yielded an initial 288 barrels of oil per day (BOPD), or 192% of the initial production target of 150 BOPD.

“The oil flows naturally, with an electric submersible pump (ESP) artificial-lift system, from the TAF Layer N2b,” SKK Migas Head Djoko Siswanto said in a report received on Monday (2 November 2026).

The drilling site is in the Benuang Structure step-out Block H, Adera Field, north-west of Prabumulih city in South Sumatra.

Operations at well BNG-089 (BNG-A12) recorded a total of 59,832 safe man-hours from the start of drilling, while maintaining a commitment to health, safety, security and environment (HSSE) standards and operational excellence.

“The well was drilled vertically using the PDSI 42.3 / N1500E rig to a final depth of 2,549 metres measured depth (mMD) / 2,548.8 metres true vertical depth (mTVD). The drilling and production-testing phase took 44 days, against a 43-day programme,” Djoko said.

More from 2 November 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/oil-production-test-in-prabumulih-surges-192-yielding-288-barrels-1793602258)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20261102113614-4-781472/melejit-192-uji-produksi-minyak-di-prabumulih-semburkan-288-barel), translated from Indonesian
Print