Official Relocation: Sadang Toll Gate Now Operational at New Site
Jasa Marga, through Jasamarga Metropolitan Tollroad, has officially relocated the transaction location of the Sadang Lama Toll Gate to the new Sadang Toll Gate starting Wednesday, 15 April 2026, at 1:30 PM WIB. This change is a key part of efforts to improve services while supporting the Jakarta-Cikampek II South Toll Road construction project in the Simpang Susun Sadang area. The relocation is not merely moving the toll gate but also introducing more modern and efficient facilities. At the new location, the Sadang Toll Gate has been equipped with four exit transaction lanes and four entry lanes. In addition to facility improvements, the location change is accompanied by traffic engineering around the area. Road users will be directed through diversion routes (detours) in line with plans to dismantle the old gate and continue building the toll ramp. To maintain safety and smoothness, the operator has installed movable concrete barriers (MCB), closed unofficial access or leakage routes, and prepared emergency lanes as anticipatory measures for on-site conditions. “Jasa Marga ensures that all operational aspects, from toll equipment readiness, transaction systems, to other supporting infrastructure, have met the minimum service standards set,” said Danang Eko Saputro, Acting Senior Manager of Representative Office 3, Jasamarga Metropolitan Tollroad Regional Division, in an official statement (15/4/2026). “Jasa Marga urges road users to remain cautious and follow the directions of officers on the ground during this transitional period of new gate operations,” he added.