North Bali Airport Designed for Wide-Body Aircraft, Set to Boost Regional Economy
The government is accelerating the realisation of the North Bali Airport development in Kubutambahan, Buleleng Regency, Bali. The airport, projected to become the second international gateway on the Island of the Gods, is designed to serve wide-body aircraft such as the Boeing 777 and Airbus A380.
The commitment to accelerate the project emerged during a meeting between President Prabowo Subianto and the President Commissioner of PT Pembangunan Bali Mandiri (PEMBARI), Baringin Panggabean, at the Presidential Residence in Hambalang, West Java, on 14 July 2026. The meeting was also attended by Minister of State Secretary Prasetyo Hadi.
On that occasion, Baringin conveyed the progress of the New Bali Airport project, which has been designated as one of the National Priority Projects in the 2025-2029 National Medium-Term Development Plan (RPJMN) under Presidential Regulation Number 12 of 2025.
During the meeting, Prabowo paid particular attention to the readiness of the airport infrastructure, especially regarding the runway’s capability and supporting facilities to serve long-haul international flights with wide-body aircraft.
Responding to this, Baringin explained that since the planning stage, North Bali Airport has been designed in accordance with international standards. All infrastructure, from the runway and airside facilities to other supporting amenities, has been prepared to accommodate the operations of Boeing 777 and Airbus A380 aircraft.
He added that all technical designs refer to a feasibility study that has received approval from the Directorate General of Civil Aviation at the Ministry of Transportation.
In addition to discussing technical aspects, Prabowo also called for the airport construction to be accelerated. The government is targeting the project to be completed within approximately three years so that its benefits can be felt by the public immediately.
The construction of the New Bali Airport will use a Public-Private Partnership (PPP) scheme. Through this scheme, funding comes from private investment, thus not burdening the State Budget (APBN), while also opening opportunities for business sector involvement in strategic infrastructure development.
The government is also preparing the development of the airport system in North Bali through the division of functions between two aviation facilities in Buleleng Regency. Based on Bali Provincial Regional Regulation Number 2 of 2023, North Bali Airport will function as a public airport for commercial flights, including wide-body aircraft. Meanwhile, Letkol Wisnu Airfield is planned to become a special airport serving light aircraft and private jets.
The plan was discussed again at a Coordination Meeting at the Coordinating Ministry for Infrastructure and Regional Development on 30 July 2026. In that meeting, the government affirmed that the development of Letkol Wisnu Airfield is focused on small-scale flights.
This consideration is based on the condition of the area surrounding Letkol Wisnu Airfield, which is already surrounded by densely populated settlements. In addition, the area is flanked by hills on the southern, western, and eastern sides, while the northern side directly borders a mangrove area and the sea.
Cultural preservation is also a concern for the government. On several hilltops around the area there are sacred temples that have stood for hundreds, even an estimated thousands, of years. These geographical and cultural conditions are deemed less conducive to developing the Letkol Wisnu area into a large-capacity international airport.
Therefore, the construction of the New Bali Airport in Kubutambahan is seen as a long-term solution to meet Bali’s need for a second international airport capable of serving wide-body aircraft while supporting future air traffic growth.
The directive to accelerate the project was also reaffirmed by President Prabowo during a Plenary Cabinet Session at the State Palace on 20 July 2026. In that session, the President asked all ministries and agencies to accelerate the implementation of national strategic projects, including the construction of North Bali Airport, which has been included in the 2025-2029 RPJMN.
If all these plans are realised, North Bali will have two aviation facilities with different but complementary functions. Letkol Wisnu Airfield will serve small aircraft and private jets, while the New Bali Airport in Kubutambahan will become an international airport for wide-body aircraft such as the Boeing 777 and Airbus A380.
The presence of both airports is expected to become a lever for equitable development across the island of Bali. In addition to improving air connectivity, the project is believed to open new economic growth centres, expand investment, create jobs, and drive the development of the tourism, trade, logistics, and services sectors in North Bali, West Bali, and East Bali.
Source: jawawa.id (https://jawawa.id/newsitem/north-bali-airport-designed-for-wide-body-aircraft-set-to-boost-regional-economy-1785995584)
Originally published by detikBali (https://www.detik.com/bali/berita/d-8606692/bandara-bali-utara-diproyeksikan-untuk-pesawat-berbadan-lebar), translated from Indonesian