Ngurah Rai-Canggu Tram to be Built by 2027, Koster: We Will No Longer Face Traffic Congestion
The Bali Provincial Government is once again discussing plans to build a tram connecting the I Gusti Ngurah Rai Airport area to Canggu. This project is being prepared as one of the solutions to overcome traffic congestion in Bali.
Governor of Bali, Wayan Koster, stated that the tram construction received direction from the Minister of National Development Planning/Head of Bappenas to the President Director of PT Kereta Api Indonesia (Karts). Koster mentioned that KAI has presented the tram construction plan three times, including details regarding the prepared budget. The project’s construction is targeted to commence in 2027.
“Starting in 2027, it will be built with a tourism and cultural concept. We hope the groundbreaking will be performed directly by the President,” explained Wayan Koster at the Bali Provincial Regional House of Representatives (DPRD) on Monday (21/09/2026).
The construction of the Ngurah Rai-Canggu tram is part of several projects prepared by the Bali Provincial Government to tackle congestion. These efforts include increasing road capacity, providing parking facilities, developing public transport, and diverting logistics transport via sea routes.
“If all of this is completed, I believe by 2028 we will no longer face congestion problems like this. (The hope is) by 2028 or 2029, everything will be finished. Astungkara,” concluded Koster.
Previously, the Badung Regency Government, together with PT Kereta Api Indonesia (Persero), officially agreed on the plan to develop a mass transport mode in the form of a tram route from I Gusti Ngurah Rai International Airport, Kuta, to Canggu. This 13.1-kilometre battery-electric infrastructure is designed in two phases to ease severe congestion points in the southern Bali region.
“This agreement is a crucial initial stage for the development of public transport in Badung. The tram route needs to be comprehensively studied so that it integrates with the road network and tourism areas,” said the Regent of Badung, I Wayan Adi Arnawa, following the signing of the agreement at the Bali Governor’s Official Residence on Tuesday (01/09/2026).
The construction of this public transport infrastructure is part of the Bali Low Emission Zone Initiative (BLEZI). The work for Phase 1A, covering the Airport-Legian route of 6.6 kilometres, is targeted to operate in the fourth quarter of 2028, while Phase 1B, covering the Legian-Seminyak-Canggu route of 6.5 kilometres, is scheduled for completion in the first quarter of 2031.
“The hope is that this tram mode becomes the primary choice for the community and tourists, thereby reducing the use of private vehicles. In addition to the Kuta-Canggu corridor, we are also encouraging connectivity for the Nusa Dua to Uluwatu route,” said Adi Arnawa.
Source: jawawa.id (https://jawawa.id/newsitem/ngurah-rai-canggu-tram-to-be-built-by-2027-koster-we-will-no-longer-face-traffic-congestion-1790045510)
Originally published by detikBali (https://www.detik.com/bali/berita/d-8673386/trem-ngurah-rai-canggu-dibangun-2027-koster-kita-tak-lagi-hadapi-macet), translated from Indonesian