Natuna Gas Block Hinges on Tax Holiday
The Jakarta Globe By Tito Summa Siahaan
Final approval to develop the long-awaited East Natuna gas block in the Riau Islands hinges on the Pertamina-led consortium securing tax exemptions from the Ministry of Finance that will help make the challenging project economical.
Energy and Mineral Resources Minister Jero Wacik said approval for the tax holiday is nearing completion, with a green-light expected this year.
Indonesia is struggling to boost local production of oil and gas after years of neglect and underinvestment shifted reliance to foreign sources of energy, which can be more expensive.
Capturing and sequestering the large volumes of carbon dioxide, which makes up 70 percent of the deposit, are adding to project costs.
Approval for the tax holiday had been expected last year. Under the plan, the consortium will be exempt from paying tax on revenues from the project for five years after production starts, according to Edy Hermantoro, the resource ministry’s director general of oil and gas.
Pertamina holds a 35 percent stake in the project, while other consortium members include ExxonMobil, Total SA and PTT Exploration and Production, which each hold a 15 percent stake.
“During the block development there will be no revenue, but when the cash flow starts to turn positive we will not tax them,” Edy added.
Edy said the consortium may also be able to take a larger-than-usual share of revenue in order to make the project more attractive. Usually producers keep 30 percent of the revenue.
“It will be at around 45 to 55 percent, but I can not say for sure as I don’t have the number with me,” Edy said.
Carbon dioxide (CO2), a potent greenhouse gas, is co-mingled with the estimated 222 trillion cubic feet in gas reserves thought to be in East Natuna. Drilling into it risks sending plumes of CO2 into the atmosphere. The remedy is pumping the material into exhausted wells.
ExxonMobil will be the operator for the 10-year exploration phase. Pertamina will operate the project during production.
The consortium plans to invest $24 billion to develop the block, which is expected to go on stream in 2024 with output of 1,200 million metric standard cubic feet per day for 30 years.
The East Natuna block is thought to be the largest such untapped gas reserve in Asia.
Source: jawawa.id (https://jawawa.id/newsitem/natuna-gas-block-hinges-on-tax-holiday-1376326800)
Originally published by The Jakarta Globe (http://www.thejakartaglobe.com/business/natuna-gas-block-hinges-on-tax-holiday/)