National Energy Council Member States Ganal Block Difficulty Level is High
Muhammad Kholid Syeirazi, a member of the National Energy Council (DEN), stated that the Ganal Block is part of the Indonesia Deepwater Development (IDD) project, which is characterised by high levels of technical difficulty, advanced technology requirements, and massive capital expenditure.
Speaking in Jakarta on Monday, Kholid noted that if Regional Owned Enterprises (BUMD) are granted participating interest (PI) rights, they will undoubtedly struggle to provide the necessary funding due to the immense scale of the investment. He added that under a PI scheme, BUMDs do not act as operators but merely receive benefits from upstream oil and gas activities. This requires injecting equity, which is capital-intensive and difficult to execute in practice.
“If BUMDs are given PI rights in the Ganal Block, it will actually become a problem for the region. This is an IDD project that is capital intensive, high-tech, and high-risk. Naturally, the investment is enormous, which usually leads to complications,” said Kholid.
He noted that regulations exist to ensure that regions receiving a 10 per cent participating interest are supported by the main contractor. In such arrangements, the BUMD’s share is typically distributed only after the project reaches the ‘pay off’ stage. This often means the BUMD’s portion is deducted from revenues after the initial years of production have covered the investment costs.
Kholid stated that given the heavy demands of the Ganal Block, other options remain possible, such as offering shares to State-Owned Enterprises (BUMN) with higher financial capabilities, considering the technical and capital risks of offshore upstream activities. He added that the possibility of a ‘farm out’ depends on whether the operators, ENI and Sinopec, decide to divest their interests. “If there are shares that wish to be released, that is possible. I believe that is the best strategy so that Pertamina, as a State-Owned Enterprise, does not have to bear the exploration risks,” he said.
Previously, the East Kalimantan Provincial Government requested management rights through a participating interest scheme for the massive oil and gas reserves discovered offshore in the Ganal Block. The Head of the East Kalimantan Energy and Mineral Resources Agency, Bambang Arwanto, stated that the regional government would apply for involvement in managing these reserves, even though the well locations fall outside the regional authority’s boundaries. The massive reserves were discovered in the Geliga and Gula wells within the Ganal Block working area. Based on exploration results, the potential reserves are estimated to reach over seven trillion cubic feet of gas and approximately 375 million barrels of oil.
Source: jawawa.id (https://jawawa.id/newsitem/national-energy-council-member-states-ganal-block-difficulty-level-is-high-1780893371)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5572379/anggota-den-sebut-tingkat-kesulitan-blok-ganal-tinggi), translated from Indonesian