MTI States Green SM Taxi Incident Occurred 35 Minutes Before Train Collision
The Indonesian Transport Society (MTI) is urging a railway safety audit in the wake of the tragedy at Bekasi Timur Station (BKST), West Java. MTI Railway Forum Chairman Deddy Herlambang stated that the tragedy originated 35 minutes earlier at the JPL 85 Ampera level crossing. Deddy explained that an electric taxi broke down in the middle of the tracks and blocked the KRL CRRC Jakarta–Cikarang (PLB 5181). Subsequently, the KRL PLB 5568a behind it was held up and unable to proceed due to the PLB 5181 being blocked by the electric taxi. “It is very tragic that in a short time (domino effect), three train sets were involved in consecutive incidents, resulting in fatalities and injuries that are still being treated by medical personnel,” Deddy said in a written statement in Jakarta on Tuesday (28/4/2026). Deddy noted that this incident is a train-on-train accident similar to the last case on 2 October 2010 at Petarukan Station, Pemalang, involving the KA Argo Bromo Anggrek on the Gambir-Pasar Turi Surabaya route, which collided with the KA Senja Utama Semarang on the Pasar Senen-Semarang Tawang route. That accident caused 35 deaths, 29 serious injuries, and five minor injuries. “The similarity in this KKA (train collision accident) is that the Argo Anggrek train rear-ended another train. In the Petarukan KKA, the driver was deemed negligent for not seeing the stop signal (red colour),” he continued. Deddy suspects that the Argo Bromo Anggrek train driver was negligent for not seeing the stop signal (red colour) at Bekasi Timur Station. He stated that the Jatinegara–Cikarang line uses open block signalling. “This means that if a train set stops, the signal behind it will automatically turn red, meaning the train behind it must stop. If the driver is negligent or does not see the red signal, it is certain that a KKA will occur where the train rear-ends the one in front,” Deddy said. Deddy explained that Article 8 of PM No. 52 of 2014 on Automatic Train Safety Devices (SKKO/ATP) states that existing railway tracks that are still state property must be equipped with Automatic Train Safety Devices (SKKO). Deddy said that railway facility operators operating on railway tracks are obliged to install Automatic Train Safety Devices (SKKO) that comply with the SKKO on the infrastructure they pass through. Deddy identified two safety issues in the KKA: the electric vehicle breaking down at the crossing without gates (JPL 85) and the driver allegedly negligent in seeing the stop signal, resulting in one train rear-ending another or a rear-end collision. “KKA accidents that have the potential to recur repeatedly with the same causes will cause boundless concern,” he added.
Source: jawawa.id (https://jawawa.id/newsitem/mti-states-green-sm-taxi-incident-occurred-35-minutes-before-train-collision-1777366318)
Originally published by Republika (https://news.republika.co.id/berita/te736l416/mti-sebut-insiden-taksi-green-sm-terjadi-35-menit-sebelum-tabrakan-kereta), translated from Indonesian