Ministry of Transport to Allocate Rp8.19 Trillion for Railway Projects, Including Pedestrian Bridges and Double Tracks
The Ministry of Transport (Kemenhub) has allocated Rp8.19 trillion for the Directorate General of Railways for 2027. This budget is intended to strengthen railway safety, services, and connectivity, including the construction of pedestrian bridges (JPO), railway double tracks, station upgrades, and the development of the wider railway network.
The Director General of Railways, Allan Tandiono, stated that the budget ceiling has increased significantly from the previous indicative ceiling of only Rp4.65 trillion. During a hearing with Commission V of the House of Representatives (DPR RI) in Jakarta, he explained that the 2027 budget consists of Rp7.83 trillion for connectivity infrastructure programmes and Rp354.67 billion for management support programmes.
In terms of expenditure types, the budget includes Rp220.43 billion for personnel costs, Rp77.97 billion for operational expenses related to office and organisational management, and Rp7.89 trillion for non-operational expenditure dedicated to railway safety, services, and connectivity.
This increase is primarily driven by an additional Rp3.5 trillion for non-operational connectivity infrastructure. This includes Rp19.98 billion for pioneer railway services, Rp2.48 trillion for the maintenance and operation of state-owned railway infrastructure (IMO), and Rp1 trillion for the management of level crossings.
Allan noted that the largest portion of the 2027 railway budget is now directed towards safety, with Rp6.71 trillion allocated to safety-related activities. This includes the aforementioned Rp2.48 trillion for the IMO backlog and Rp1 trillion for level crossing management. Meanwhile, railway connectivity activities have been allocated Rp866.15 billion, which includes funding for pioneer railway services and the South Sumatra LRT.
Several strategic projects are included in the 2027 allocation. In the Banten-Jakarta region, projects include the construction of pedestrian bridges at Cikarang and Kemayoran stations, upgrades to Tanah Abang Station, and Phase I of the Jabodetabek Railway Capacity Enhancement. In the Central Java-DIY region, funds are directed towards the Solo-Semarang double-track Phase I and the construction of a motorcycle pedestrian bridge (JPOM) between Tambak and Ijo stations.
In East Java, the budget covers the Wonokromo-Sepanjang double-track and the Surabaya Regional Railway Line Phase I. In Sumatra and Sulawesi, the allocation covers the maintenance of state-owned infrastructure, the South Sumatra LRT, and pioneer railway services on the Makassar-Parepare route, as well as land acquisition in Maros, Makassar, and Pangkep.
A major component of the 2027 budget is the repayment of a Rp2.48 trillion backlog for the maintenance and operation of state-owned railway infrastructure, which includes arrears from 2023 and 2024. Overall, the total funding requirement for the Directorate General of Railways under the 2025-2029 Strategic Plan is estimated at Rp40.18 trillion, aimed at fulfilling connectivity, service, safety, and technical support programmes.
More from 3 September 2026 โ
Source: jawawa.id (https://jawawa.id/newsitem/ministry-of-transport-to-allocate-rp8-19-trillion-for-railway-projects-including-pedestrian-bridges-and-1788425836)
Originally published by CNBC Indonesia (https://www.cnbcindonesia.com/news/20260903133510-4-764654/kemenhub-mau-guyur-rp819-t-untuk-kereta-ada-jpo-hingga-jalur-ganda), translated from Indonesian