Indonesian Political, Business & Finance News

Ministry of Agriculture Tightens Supervision of Rice Field Expansion in Kalimantan to Accelerate Planting

| Source: Antara (Indonesian) Translated from Indonesian | Agriculture
Ministry of Agriculture Tightens Supervision of Rice Field Expansion in Kalimantan to Accelerate Planting
Image: Antara (Indonesian)

The Ministry of Agriculture (Kementan) is tightening supervision of the implementation of the Rice Field Expansion Programme in the Kalimantan region through S-curve-based monitoring, inspections of heavy machinery readiness, and periodic evaluations of work achievements to support the acceleration of rice planting.

Director General of Agricultural Land and Irrigation at the Ministry of Agriculture, Hermanto, stated that supervision is being conducted from the very beginning of the work to ensure all construction stages proceed according to the schedules established by each project executor.

“All field supervisors must conduct objective monitoring of work progress, including ensuring the alignment between the resources prepared in the field and the documents submitted during the procurement process,” he said during the Kalimantan-wide Rice Field Expansion Coordination Meeting in Banjarbaru, South Kalimantan, on Saturday.

He emphasised that service providers must fulfil all commitments outlined in the e-Catalogue documents, particularly regarding the number of heavy machines and work capacity, which serve as the basis for calculating the completion of construction work.

“Supervision of equipment readiness is a critical factor because the availability of adequate heavy machinery will determine the executors’ ability to meet work targets according to the established schedule,” he added.

To maintain timely execution, the Ministry of Agriculture will strictly monitor work progress using S-curves, comparing daily targets with actual field achievements so that potential delays can be detected immediately. According to Hermanto, this mechanism allows the government to take corrective measures more quickly when discrepancies between the work plan and actual field realisation are found.

He asserted that the government will issue warnings if a deviation of more than five per cent occurs between targets and work achievements, as such conditions could potentially disrupt the overall construction schedule. In addition to monitoring work progress, the government is also encouraging the accelerated mobilisation of equipment and personnel to ensure all construction stages can run optimally while weather conditions remain favourable for field activities.

He emphasised that disciplined control is required to ensure construction work proceeds according to schedule, meets specified requirements, and produces land that is ready for planting immediately upon completion.

“We must remain disciplined regarding targets and work achievements so that construction implementation can proceed according to the established plan,” said Hermanto.

The government aims to expand new rice fields by 400,000 to 480,000 hectares, supported by a budget of Rp10 trillion. This national strategic programme is being implemented by the Ministry of Agriculture through the People’s Rice Field Expansion (CSR) programme and is directly overseen through synergy with the Indonesian Army (TNI AD). This massive land expansion target is intended to accelerate national food self-sufficiency, compensate for the loss of productive land due to land conversion, and establish new agricultural centres outside of Java.

More from 6 June 2026 →

Cite this article
Source: jawawa.id (https://jawawa.id/newsitem/ministry-of-agriculture-tightens-supervision-of-rice-field-expansion-in-kalimantan-to-accelerate-planting-1780801273)
Originally published by Antara (Indonesian) (https://www.antaranews.com/berita/5597189/kementan-awasi-ketat-cetak-sawah-di-kalimantan-percepat-tanam-padi), translated from Indonesian
Print