Maslahat Suspension Bridge Eases Access for Thousands of Residents
The long wait for new bridge infrastructure for residents of two villages in Tasikmalaya Regency has finally come to an end. Crossing activities, which previously relied on rafts and simple bamboo bridges, have now been replaced by a sturdy suspension bridge connecting the two villages.
Sinergi Foundation, in collaboration with BSI Maslahat and Perum Perhutani, officially handed over the Maslahat Suspension Bridge, which connects Sukamenak Village in the Sukarame District with Cilolohan Village in the Tanjungjaya District, Tasikmalaya Regency, West Java, on Friday (19/06/2026).
The presence of this bridge serves as a solution to the community’s need for safe and proper crossing facilities, which had been limited for many years. For the local population, this bridge is more than just connecting infrastructure; it is the lifeblood of their daily activities.
Before the construction of this sturdy bridge, residents had to navigate various crossing methods, ranging from using rafts to bamboo bridges that had previously broken, and wooden plank bridges that deteriorated over time. Many users had experienced accidents while crossing.
Iwan Setiawan, a community representative, expressed that the new bridge has been welcomed with gratitude and joy by the residents. Beyond providing safety, the bridge has significantly transformed local mobility. Travel time, which previously took approximately 1.5 hours, can now be completed in just 15 minutes. Access to Tasikmalaya City has become faster and easier for around 1,000 pedestrians and motorcyclists who use the bridge daily.
He noted that easier access will have a major impact on community life. Economic activities will become smoother, agricultural products and home industries will be easier to market, and access to education for students from primary to high school levels will be greatly assisted. Furthermore, residents requiring healthcare services can now reach medical facilities more quickly.
The suspension bridge was constructed over a period of 31 days, from 13 March to 14 April 2026. With an estimated construction lifespan of 30 to 35 years, the bridge is designed to accommodate a maximum of 10 people or one two-wheeled vehicle at a time to maintain safety and durability.
Hadi Supriyadi, Senior Partnership at Sinergi Foundation, expressed appreciation to all parties involved in the bridge’s construction, including BSI Maslahat, Perhutani, donors, and the community members who worked together from the planning and foundation stages to the installation of the slings and the inauguration.
“This bridge is the result of collaboration between many parties who share the same hope: to bring benefits to the community. We hope its presence will pave the way for economic growth, ease access to education, accelerate healthcare services, and support various other aspects of residents’ lives,” he said.
Meanwhile, the Head of Perum Perhutani KPH Tasikmalaya, Danu Prasetyo, expressed hope that the bridge would be well-maintained and utilised by the community so that its benefits can be felt in the long term. He also opened opportunities for further collaboration with the Sinergi Foundation to implement similar bridge construction projects in remote areas that require more adequate connecting access.
Through the establishment of the Maslahat Suspension Bridge, the collaboration between Sinergi Foundation, BSI Maslahat, Perhutani, and the community serves as evidence that mutual cooperation can provide real solutions to community needs. Not only does it connect two regions, but this bridge also connects the hopes of residents towards a safer, easier, and more prosperous life.
Source: jawawa.id (https://jawawa.id/newsitem/maslahat-suspension-bridge-eases-access-for-thousands-of-residents-1782391968)
Originally published by Republika (https://khazanah.republika.co.id/berita/th6sj3472/jembatan-gantung-maslahat-permudah-akses-ribuan-warga), translated from Indonesian