Maintenance Works at KM72-188 of Cipali Toll Road: Drivers Advised to Reduce Speed
Road maintenance work is being carried out gradually along the Cikopo-Palimanan (Cipali) Toll Road from KM 72 to KM 188. These works are being conducted to ensure the road remains in optimal condition while supporting the safety and comfort of road users.
“During the period of 15-17 September 2026, maintenance work is taking place at several points,” said Ardam Rafif Trisilo, Head of Sustainability Management & Corporate Communications at Astra Tol Cipali, on Wednesday (16/09/2026).
He noted that the work is occurring at various locations for traffic travelling from both Cirebon and Jakarta. For the Cirebon direction, work points include KM 173, KM 176, KM 178-KM 179, KM 183-KM 184, and KM 186. Meanwhile, for the Jakarta direction, work is being carried out at KM 187, KM 179-KM 176, KM 174, KM 172, KM 170-KM 168, KM 166, and KM 164.
Ardam stated that lane adjustments will be implemented at several locations during the execution of the works. This is intended to support the safety of the work area and ensure the smooth progress of the maintenance process.
He urged road users passing through the work zones to increase their vigilance and maintain a safe following distance. Furthermore, drivers are advised to pay attention to traffic signs and follow the instructions of officials on site.
“The maximum speed in the work area is 40 km per hour,” Ardam emphasised.
Source: jawawa.id (https://jawawa.id/newsitem/maintenance-works-at-km72-188-of-cipali-toll-road-drivers-advised-to-reduce-speed-1789661767)
Originally published by Republika (https://rejabar.republika.co.id/berita/tlijzn282/ada-pemeliharaan-di-km72188-tol-cipali-pengendara-dilarang-ngebut), translated from Indonesian